MECON LIMITED<br />

REGD. OFF : RANCHI (BIHAR)<br />

Document6<br />

PROCESS & PIPING<br />

DESIGN SECTION<br />

NEW DELHI<br />

TITLE MAINLINE CONSTRUCTION<br />

(ONSHORE)<br />

6.12 Provisions for negative buoyancy to the pipe<br />

7.0 BENDING<br />

STANDARD SPECIFICATION<br />

SPECIFICATION NO. PAGE 27 OF 53<br />

MEC/S/05/62/01 REVISION A<br />

CONTRACTOR shall check if up-floating danger is present in open trench and<br />

then shall take appropriate measures to prevent up-floating such as applying soil<br />

dams and dewatering <strong>of</strong> trench or temporary filling <strong>of</strong> water into the line (in<br />

exceptional cases).<br />

In the case <strong>of</strong> water on the ditch bottom when the pipeline is being laid, the ditch<br />

shall be drained to the extent and for the time required to make a visual<br />

inspection <strong>of</strong> the ditch bottom. After this inspection, the presence <strong>of</strong> water will be<br />

allowed provided its level does not cause sliding <strong>of</strong> the ditch sides and pipe<br />

floating before backfilling when no concrete weighting is provided.<br />

The water pumped out <strong>of</strong> the ditch shall be discharged into a natural water<br />

course.<br />

Wherever up-floating <strong>of</strong> the pipeline after backfilling is to be reckoned with, antibuoyancy<br />

measures shall be provided by CONTRACTOR for areas indicated in<br />

the drawings or as may be encountered during construction, using one or a<br />

combination <strong>of</strong> the following methods :<br />

weighting by applying a continuous concrete coating around the pipe;<br />

weighting by installing saddle weights;<br />

installing metal anchors screwed into the suboil in pairs;<br />

deeper burial <strong>of</strong> pipeline;<br />

provision <strong>of</strong> select backfill material.<br />

The above provisions shall be in accordance with the relevant specifications<br />

and/ or job standards/ drawings.<br />

CONTRACTOR shall preferably provide for changes <strong>of</strong> vertical and horizontal<br />

alignment by making elastic bends. CONTRACTOR may provide cold field<br />

bends, at its option for change <strong>of</strong> direction and change <strong>of</strong> slope. COMPANY at<br />

its option, may authorise fabricated bends for installation at points where in<br />

COMPANY's judgement the use <strong>of</strong> such bends is unavoidable.