MECON LIMITED<br />

Delhi<br />

PROCESS & PIPING<br />

DESIGN SECTION<br />

TECHNICAL SPECIFICATION FOR<br />

PERMANENT CATHODIC<br />

PROTECTION SYSTEM<br />

TECHNICAL SPECIFICATION NO. : MEC/TS/05/62/016B REV-1 Page 2 <strong>of</strong> 24<br />

IEEF publications<br />

DIN publications<br />

In case <strong>of</strong> conflicting requirements amongst any <strong>of</strong> the above standards, the<br />

publication having most stringent requirement shall be governing.<br />

3.0 SYSTEM IMPLIMENTATION<br />

All work to be performed and supplies to be effected as a part <strong>of</strong> contract shall require<br />

specific approval <strong>of</strong> owner or his authorised representative. Major activities requiring<br />

approval shall include but not limited to the following :<br />

a) Corrosion survey data interpretation report and plot plans for land acquisition.<br />

b) Conceptual system design.<br />

c) Basic engineering package.<br />

d) Purchase requisition for major equipment and vendor approval.<br />

e) Detailed engineering package.<br />

f) Field testing and commissioning procedures.<br />

g) Procedures for interference testing and mitigation.<br />

h) As built documentation.<br />

i) CPL survey procedure.<br />

4.0 CORROSION SURVEY<br />

4.1 General<br />

4.1.1 The details <strong>of</strong> corrosion survey including soil resistivity data along the right <strong>of</strong> way and<br />

other data required for CP design are attached with this specification. However,<br />

verification <strong>of</strong> its veracity and adequacy shall be the entire responsibility <strong>of</strong> the<br />

contractor. In addition contractor shall have to generate / collect additional data<br />

required for completeness <strong>of</strong> the job.<br />

4.1.2 To carry out soil resistivity measurement (at pipeline depth) Wenner’s 4-pin method or<br />

an equivalent method approved by owner shall be used. Survey instruments shall have<br />

maximum AC and DC ground current rejection feature.<br />

4.2 Soil resistivity survey at impressed current anode ground bed plot<br />

4.2.1 Each selected anode bed plot shall be sub- divided into sub-plots. Sizes <strong>of</strong> sub-plots<br />

shall depend upon the expected depth for soil resistivity investigations. Each <strong>of</strong> these<br />

sub-plots shall be investigated for restivity data individually. Sufficient observations<br />

shall be taken at each <strong>of</strong> these sub-plots as required and desired by Owner/ Owner’s<br />

representative to obtain sufficient information about sub- soil stratification and,<br />

wherever possible, to establish the depth <strong>of</strong> water table/ basement. The number <strong>of</strong><br />

D:\old data\FATEH\MP Region\Kailaras\Tender RFQ\TCP&PCP\Permanent Cathodic Proection - 016B-R1.doc