area on the pipe shall show presence <strong>of</strong> adhesive. Disbondment/<br />

separation at epoxy to steel interface or epoxy/ adhesive interface or<br />

adhesive/ polyethylene interface shall not be permitted. The failure mode<br />

shall be recorded for each test.<br />

c. In case the above tests do not comply with the above requirement,<br />

CONTRACTOR shall test all the preceding and succeeding coated pipes. If<br />

both pipes pass the test, then the remainder <strong>of</strong> the pipe joints in that<br />

shift shall be deemed satisfactory. If either pipe fails to meet the<br />

specified requirements, all pipes coated during the shift shall be tested<br />

until the coating is provided acceptable. Rejected coated pipes shall be<br />

stripped and re-coated in accordance with approved procedure, at<br />

CONTRACTOR’s expense.<br />

d. The frequency <strong>of</strong> bond strength test as per para 10.5(b) for cut back<br />

portion may be reduced depending upon the consistently <strong>of</strong> result to one<br />

pipe in every twenty five(25) instead <strong>of</strong> every fifteen pipes, at the sole<br />

discretion <strong>of</strong> the COMPANY Representative.<br />

10.6 Impact Strength<br />

a. Impact resistance test shall be conducted as per clause 5.3.3 (b) <strong>of</strong> this<br />

specification. Initially the frequency <strong>of</strong> test shall be 2(two) coated pipes<br />

per shift, which may be further reduced and/ or waived depending upon<br />

consistently acceptable results at the sole discretion <strong>of</strong> COMPANY’s<br />

representative.<br />

b. Minimum thirty(30) impacts located equidistant along the length <strong>of</strong><br />

coated pipe shall be performed.<br />

c. Immediately after testing, the test area shall be subjected to holiday<br />

detection at the same voltage as used prior to impact strength test. The<br />

pipe shall be rejected if any holiday is noted in the test area.<br />

d. In case <strong>of</strong> test failure, retesting and disposal <strong>of</strong> coated pipe shall be as<br />

per 10.5(c) above.<br />

10.7 Indentation Hardness<br />

a. Indentation hardness test shall be as per clause 5.3.3 (c) <strong>of</strong> this<br />

specification. The frequency <strong>of</strong> test shall be initially 2(two) coated pipes<br />

per shift which shall be further reduced to one test each on 2 coated<br />

pipes per week at random after 1 week <strong>of</strong> consistently acceptable results.<br />

Two samples for each temperature shall be taken from the cut back<br />

portion <strong>of</strong> coated pipe and one in middle <strong>of</strong> the pipe for this test.<br />

b. In case <strong>of</strong> test failure, retesting and disposal <strong>of</strong> coated pipe shall be as<br />

per 10.5(c) above.<br />

\\Akjha\work contrac\standard TS for Pipe Line WC (Vol-<strong>II</strong>) MASTER FOLDER\14 3-layer pe coated line pipe\3-LPE Coating <strong>of</strong> Linepipes-TS-R2 14.doc Page 25 <strong>of</strong> 35