MECON LIMITED<br />

REGD. OFF : RANCHI (BIHAR)<br />

PROCESS & PIPING<br />

DESIGN SECTION<br />

NEW DELHI<br />

\\Akjha\work contrac\standard TS for Pipe Line WC (Vol-<strong>II</strong>) MASTER FOLDER\04A major water crossing\Major Water Crossing -Final 04.doc<br />

STANDARD SPECIFICATION<br />

TITLE MAJOR WATER CROSSINGS SPECIFICATION NO. PAGE 10 OF 14<br />

MEC/S/05/62/04 REVISION 0<br />

6.6 The maximum allowed horizontal deviation from the required center line shall be<br />

limited to the following :-<br />

For pipeline dia. upto and including 24" - 300 mm<br />

For pipeline dia greater than 24" - 500 mm<br />

6.7 Prior to backfill the pipeline shall, when laid in the trench, conform to the bottom<br />

contour <strong>of</strong> the trench grade, so that it will be firmly, uniformly and continuously<br />

supported. COMPANY may employ a diver or use other suitable methods to<br />

inspect the bottom <strong>of</strong> the trench and/ or after the pipe is installed prior to<br />

backfilling <strong>of</strong> the trench. CONTRACTOR shall facilitate the work <strong>of</strong> the diver and<br />

shall furnish the necessary equipment and helpers (other than actual diving<br />

equipment) necessary for the diver/ inspector to perform his work.<br />

6.8 If the pipe does not properly fit the trench or does not rest at sufficient depth to<br />

satisfy the minimum requirements <strong>of</strong> cover as specified in approved drawings,<br />

the CONTRACTOR shall make necessary corrections to either trench or the<br />

pipe alignment or to both so that the pipe, when finally in position in the trench,<br />

shall fully meet the specifications, failing which CONTRACTOR may be asked to<br />

remove the pipeline. This shall be done at no extra to the COMPANY.<br />

6.9 Installation <strong>of</strong> Parallel Pipelines<br />

When parallel pipelines are required to be installed for a major water crossing.<br />

CONTRACTOR shall further comply with the following requirements.<br />

6.9.1 Depending on the diameters <strong>of</strong> the parallel pipelines, the characteristics <strong>of</strong> the<br />

crossing and the limitations <strong>of</strong> CONTRACTOR's equipment, CONTRACTOR<br />

may propose installation <strong>of</strong> the parallel pipelines either together in a combined<br />

operation or separately in a common trench.<br />

6.9.2 If the pipelines are installed together, the minimum clear distance between the<br />

parallel pipelines (measured from the outside diameters <strong>of</strong> the concrete coated<br />

pipes) shall be 300mm. CONTRACTOR shall provide spacers at sufficient<br />

intervals along the length <strong>of</strong> the pipe section(s), securely fixed to the pipes, or<br />

shall propose other suitable alternative methods, so as to ensure that the<br />

stipulated minimum clear distance is maintained. The spacers may be removed<br />

before the trench is backfilled.