MECON LIMITED<br />

REGD. OFF : RANCHI (BIHAR)<br />

PROCESS & PIPING<br />

DESIGN SECTION<br />

NEW DELHI<br />

\\Akjha\work contrac\standard TS for Pipe Line WC (Vol-<strong>II</strong>) MASTER FOLDER\04A major water crossing\Major Water Crossing -Final 04.doc<br />

STANDARD SPECIFICATION<br />

TITLE MAJOR WATER CROSSINGS SPECIFICATION NO. PAGE 14 OF 14<br />

MEC/S/05/62/04 REVISION 0<br />

• Clearance certificates from the land owners and authorities having<br />

jurisdiction regarding satisfactory clean-up and restoration <strong>of</strong> pipeline<br />

ROU and work areas.<br />

11.2 After completion <strong>of</strong> construction CONTRACTOR shall prepare & furnish six sets<br />

<strong>of</strong> copies and two sets <strong>of</strong> reproducible <strong>of</strong> As-built drawing for the crossings.<br />

As-built drawings shall be as a minimum, include the following information.<br />

• True pr<strong>of</strong>ile <strong>of</strong> the bed and banks <strong>of</strong> the water crossing along the pipeline<br />

after backfilling.<br />

• True pr<strong>of</strong>ile <strong>of</strong> the pipeline as installed and the top <strong>of</strong> cover to top <strong>of</strong> pipe<br />

at regular intervals.<br />

• Location and angle <strong>of</strong> sag and over bends.<br />

• Extent <strong>of</strong> backfill.<br />

• Extent <strong>of</strong> bank protection.<br />

11.3 All documents shall be in English Language