MECON LIMITED<br />

REGD. OFF: RANCHI (BIHAR)<br />

PROCESS & PIPING<br />

DESIGN SECTION<br />

NEW DELHI<br />

STANDARD SPECIFICATION<br />

TITLE Flushing and Testing SPECIFICATION NO. PAGE 6 OF 9<br />

MEC/S/05/62/11 REVISION 0<br />

Open ends <strong>of</strong> piping system where blanks cannot be used, such as pumps,<br />

compressors, turbines or wherever equipment or pipe spool have been<br />

receivered or disconnected prior to hydrostatic testing, shall be blinded – <strong>of</strong>f by<br />

using standard blind flanges <strong>of</strong> same rating as the piping system being tested.<br />

Pressure gauges used in testing shall be installed as close as possible to the<br />

lowest point in the piping system to be tested, to avoid overstressing <strong>of</strong> any <strong>of</strong><br />

the lower portion <strong>of</strong> the system. For longer lines and vertical lines, two or more<br />

pressure gauges shall be installed at locations selected by the<br />

Engineer-in-charge. For lines containing check valves any <strong>of</strong> the following<br />

alternatives shall be adopted for pressure testing. Wherever possible pressurise<br />

up-stream side <strong>of</strong> valve.<br />

Replace the valve by a temporary spool and re-install the valve after testing.<br />

Provide blind on valve flanges and test the upstream and downstream <strong>of</strong> the line<br />

separately and remove the blind after testing. All these flanges, temporary<br />

gaskets shall be provided during testing and shall be replaced by permanent<br />

gaskets subsequently. For check valves in lines 1-1/2" and below, flapper or<br />

seat shall be removed during testing (if possible). After completion <strong>of</strong> testing the<br />

flopper/ seat shall be refitted.<br />

Gas lines when hydrostatically tested shall be provided with additional temporary<br />

supports during testing as directed by Engineer-in-charge.<br />

Piping which is spring or counter – weight supported shall be temporarily<br />

supported, where the weight <strong>of</strong> the fluid would overload the support. Retaining<br />

pins for spring supports shall be removed only after testing is completed and test<br />

fluid is completely drained.<br />

When testing any piping system, air or steam <strong>of</strong> approximately 2 kg/cm 2 (g) may<br />

be used as preliminary test to detect missing gaskets etc. as this avoids the<br />

necessity <strong>of</strong> purging the gas to make repairs. However, this method may not be<br />

used for this purpose, if the steam temperature is more than the design temp. <strong>of</strong><br />

the line.