04.08.2013 Views

Volume-II of IV - GAIL

Volume-II of IV - GAIL

Volume-II of IV - GAIL

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

MECON LIMITED<br />

REGD. OFF RANCHI<br />

PROCESS & PIPING<br />

DESIGN SECTION<br />

NEW DELHI<br />

STANDARD SPECIFICATION<br />

SCRAPPER TRAP<br />

TECHNICAL SPECIFICATION NO. : MEC/S/05/62/007 REV-1 Page 10 <strong>of</strong> 10<br />

Once the above said documents have been approved by the Purchaser, any changes in<br />

design, material and method <strong>of</strong> manufacturer shall be notified to the Purchaser, whose<br />

approval in writing <strong>of</strong> all changes shall be obtained before the traps are manufactured.<br />

10.3 Within four weeks from the approval date Manufacturer shall submit one reproducible<br />

and six copies <strong>of</strong> all approved drawings, documents and specification as listed in clause<br />

10.2 <strong>of</strong> this specification.<br />

10.4 Prior to shipment, the manufacturer shall submit one reproducible and six copies <strong>of</strong> the<br />

following :<br />

D:\Technical Specifications & Standards\007 - Scrapper Trap - TS.doc<br />

a) Test certificate as listed in clause 6.0 <strong>of</strong> this specification.<br />

b) Manual for installation, erection instructions, maintenance and operations<br />

instruction.<br />

10.5 All documents shall be in English Language.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!