CONTRACTOR shall give reasonable notice <strong>of</strong> time and shall provide without<br />

charge reasonable access and facilities required for inspection to the COMPANY’s<br />

Representative. Inspection and tests performed or witnessed by COMPANY’s<br />

Representative shall in no way relieve the CONTRACTORs obligation to perform<br />

the required inspection and tests.<br />

10.15 In case rate <strong>of</strong> defective or rejected pipes and/ or samples tests are 10% or<br />

more for a single shift (typically 8 hours), CONTRACTOR shall be required to stop<br />

production and carry out a full and detailed investigation and shall submit<br />

findings to COMPANY for approval. CONTRACTOR shall recommence the<br />

production only after getting the written permission from COMPANY.<br />

Under no circumstances any action or omission <strong>of</strong> the COMPANY’s representative<br />

shall relieve the CONTRACTOR <strong>of</strong> his responsibility for material and quality <strong>of</strong><br />

coating produced. No pipes shall be transported from the coating plants unless<br />

authorised by COMPANY in writing.<br />

11.0 HANDLING, TRANSPORTATION AND STORAGE<br />

11.1 The CONTRACTOR shall be fully responsible for the pipe and for the pipe<br />

identification marking from the time <strong>of</strong> “taking over” <strong>of</strong> bare pipe from COMPANY<br />

until such time that the coated line pipes are `handed over’ and/ or installed in<br />

the permanent installation as the case may be according to the provisions <strong>of</strong> the<br />

Contract.<br />

At the time <strong>of</strong> “taking over” <strong>of</strong> bare pipes CONTRACTOR shall inspect and record<br />

all the relevant details referred above including pipe defects in the presence <strong>of</strong><br />

COMPANY. All pipes shall be checked for bevel damages, weld seam height,<br />

dents, gouges, corrosion and other damages. COMPANY Representative shall<br />

decide whether pipe defects/ damages are suitable for repair. Damage to the<br />

pipes which occur after the CONTRACTOR has taken delivery such as dents,<br />

flats, or damage to the weld ends shall be cut <strong>of</strong>f or removed and pipes<br />

rebevelled and repaired again as necessary. The cost <strong>of</strong> this work, as well as that<br />

<strong>of</strong> the pipe lost in cutting and repair shall be to the CONTRACTOR’s account. All<br />

such works shall be carried out after written approval <strong>of</strong> the COMPANY. Any<br />

reduction in length shall be indicated in the CONTRACTOR’s pipe tracking<br />

system.<br />

11.2 The CONTRACTOR shall unload, load, stockpile and transport the bare pipes<br />

within the coating plant(s) using suitable means and in a manner to avoid<br />

damage to pipes.<br />

The CONTRACTOR shall stockpile the bare pipes at the storage area <strong>of</strong> the<br />

coating plant. The CONTRACTOR shall prepare and furnish to COMPANY a<br />

procedure/ calculation generally in compliance with API RP-5L1 for pipe stacking,<br />

which shall be approved by COMPANY prior to commencement.<br />