MECON LIMITED<br />

REGD. OFF: RANCHI (BIHAR)<br />

PROCESS & PIPING<br />

DESIGN SECTION<br />

NEW DELHI<br />

TITLE PIPING FABRICATION AND<br />

ERECTION<br />

STANDARD SPECIFICATION<br />

SPECIFICATION NO. PAGE 57 OF 62<br />

MEC/S/05/62/06 REVISION 0<br />

3.7 Three copies <strong>of</strong> each acceptable radiographic procedure (as outlined in<br />

Specification no. MEC/S/O5/62/02) and three copies <strong>of</strong> radiographic qualification<br />

records, shall be supplied to COMPANY. One set <strong>of</strong> the qualifying radiographs<br />

on the job shall be kept by the CONTRACTOR's authorised representative to be<br />

used as a standard for the quality <strong>of</strong> production radiographs during the job. The<br />

other two sets shall be retained by COMPANY for its permanent record.<br />

3.8 Three copies <strong>of</strong> the exposure charts relating to material thickness, kilo voltage,<br />

source to film distance and exposure time shall also be made available to<br />

COMPANY by the CONTRACTOR.<br />

3.9 The CONTRACTOR shall, on a daily basis, record for each radiograph (1)<br />

radiography number (2) approximate chainage <strong>of</strong> weld location, (3) whether or<br />

not the welds meet the specified acceptance standards and (4) the nature and<br />

approximate location <strong>of</strong> unacceptable defects observed. It must be possible to<br />

relate to a particular butt weld and welder on piping drawing and pipeline<br />

alignment drawing.<br />

3.10 Each day's production <strong>of</strong> processed radiographs shall be properly packaged<br />

separately, identified by at least the (1) date, (2) radiographic unit, (3) job<br />

locations, (4) starting and ending progress survey stations and (5) shall include<br />

original and three copies <strong>of</strong> the daily radiographic record. The package shall be<br />

submitted to the COMPANY daily when possible, but in no event later than noon<br />

<strong>of</strong> the following day.<br />

3.11 The CONTRACTOR shall provide all the necessary facilities at site, such as a<br />

dark room with controlled temperature, film viewer etc. to enable the COMPANY<br />

to examine the radiographs.<br />

3.12 The CONTRACTOR, if found necessary, may modify the procedure <strong>of</strong><br />

radiographic examination suiting the local conditions prevailing. This shall,<br />

however, be subject to the approval <strong>of</strong> the COMPANY.<br />

3.13 COMPANY shall have free access to all the CONTRACTOR's work facilities in<br />

the field.<br />

3.14 Any approval granted by the COMPANY shall not relieve the CONTRACTOR <strong>of</strong><br />