The contractor shall be responsible for placing these devices (Marker<br />

Magnets or Locator coils or any other device) at suitable interval so that<br />

the defect can be easily located in the field with minimum above ground<br />

measurement. It may be noted that placement <strong>of</strong> marker devices, their<br />

retrieval and locating the identified defect in the field shall be the<br />

responsibility <strong>of</strong> the contractor. The liquidation <strong>of</strong> defects, if any, is<br />

however, not included in the scope <strong>of</strong> work <strong>of</strong> the contract.<br />

11.0 DEFECT VERIFICATION<br />

At the discretion <strong>of</strong> the COMPANY/ CONSULTANT identify at least two<br />

verification dig sites for each pipeline jointly with MECON and <strong>GAIL</strong> from<br />

the recorded data and provide MECON/ <strong>GAIL</strong> with their distance from the<br />

nearest pipeline feature or reference marker to facilitate location <strong>of</strong> defect<br />

in the field.<br />

The contractor shall depute his representative to observe the verification<br />

at verification sites for proving that filed log detected anomalies conform<br />

to sizing including linear and circumferential positions.<br />

12.0 ABNORMAL SITUATIONS<br />

The objective <strong>of</strong> this section is to write down foreseeable abnormal<br />

circumstances for taking appropriate measures, should such a condition<br />

arise during implementation <strong>of</strong> project.<br />

The following abnormal condition have been foreseen by the Comapny.<br />

However, if the BIDDER foresees any other abnormal condition, he is free<br />

to make a mention <strong>of</strong> the same in his technical BID <strong>of</strong>fer:<br />

12.1 Tool Failure<br />

CONTRACTOR is required to get valid interpretable and verifiable data for<br />

pipeline. In case CONTRACTOR’S equipment fails to perform electronic<br />