MECON LIMITED<br />

Delhi<br />

PROCESS & PIPING<br />

DESIGN SECTION<br />

TECHNICAL SPECIFICATION FOR<br />

TEMPORARY CATHODIC<br />

PROTECTION SYSTEM<br />

TECHNICAL SPECIFICATION NO. : MEC/TS/05/62/016A REV-1 Page 16 <strong>of</strong> 19<br />

11.2 Commissioning<br />

(vii) Spark Gap Arrester<br />

- Location/ identification No<br />

- Ratings<br />

- Check for healthiness<br />

11.2.1 Natural pipe to soil potential shall be measured at each test station location prior to<br />

connecting anodes to pipeline. The pipe to soil potential observation shall be repeated<br />

after connecting the anodes and allowing sufficient time for polarisation. The current<br />

output <strong>of</strong> the anode installation shall also be measured to ensure that it does not<br />

exceed the output current capacity <strong>of</strong> the anodes. In case the anode output current<br />

exceeds the rated capacity it shall be controlled by insertion <strong>of</strong> resistance element in<br />

the anode circuit inside test station and the pipe to soil potential shall be rechecked for<br />

adequacy <strong>of</strong> protection. Additional anodes shall be provided where required to achieve<br />

desired level <strong>of</strong> protection.<br />

Each anode installation shall become individually operational as above.<br />

11.2.2 After connecting all the anode ground beds to pipeline, measurement <strong>of</strong> pipe to soil<br />

potentials shall be taken at each test station to ensure conformity to protection<br />

criteria.<br />

11.2.3 In case <strong>of</strong> insufficient protection as per the CP design criteria on any portion <strong>of</strong> the<br />

pipeline, CONTRACTOR shall carry out necessary additions modification to the<br />

provided protection in consultation with the ENGINEER.<br />

11.3 Interference Mitigation<br />

Investigation shall be made for stray current electrolysis <strong>of</strong> the pipeline, AC induction<br />

on pipeline due to overhead high voltage line, interference due to high voltage DC<br />

lines, electric traction, etc.<br />

Measurements including pipe to soil potential and pipeline current etc., on the<br />

pipeline/structure being CP protected shall be made to investigate the current<br />

discharge and collection locations.<br />

In case <strong>of</strong> fluctuating stray currents investigation shall be made continuously over a<br />

period <strong>of</strong> time and if required simultaneously at different locations to find out the stray<br />

current source. For long time measurements, recorders shall preferably be used.<br />

Where foreign pipeline (unprotected or protected by independent CP system) runs in<br />

parallel to the pipeline in same trench or very near to the pipeline, and is not bonded<br />

D:\old data\FATEH\MP Region\Kailaras\Tender RFQ\TCP&PCP\Temporary Cathodic Protection - 016A-R1.doc

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!