04.08.2013 Views

Volume-II of IV - GAIL

Volume-II of IV - GAIL

Volume-II of IV - GAIL

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

24.0 PROCEDURE FOR APPROVAL OF NEW COATING MATERIALS AND<br />

MANUFACTURER’S<br />

Following procedure is recommended to be followed for approval <strong>of</strong> new<br />

manufacturers.<br />

24.1 The manufacturer should arrange testing <strong>of</strong> the inorganic zinc silicate<br />

coating materials as per the list <strong>of</strong> tests given in para 24.5 below from one<br />

<strong>of</strong> the reputed Government laboratories.<br />

24.2 Samples <strong>of</strong> coating should be submitted to the Govt. laboratory in sealed<br />

containers with batch no. and test certificate on regular format <strong>of</strong><br />

manufacturer’s testing laboratory. The sampling shall be certificate and<br />

sealed by a citifying agency.<br />

24.3 All test panels should be prepared by govt. testing agency coloured<br />

photographs <strong>of</strong> test panels should be taken before and after the test<br />

should be enclosed alongwith test report.<br />

Sample batch. No. and manufacturer’s test certificate should ne enclosed<br />

alongwith the report. Test reports contain details <strong>of</strong> observation and<br />

rusting if any, as per the testing code. Suggested government laboratories<br />

are:<br />

RRL, Hayderabad<br />

HBTI, Kanpur<br />

DMSRDE, Kanpur<br />

<strong>II</strong>T, Mumbai<br />

BIS Laboratory<br />

UDCT, Mumbai<br />

RITES, Calcutta<br />

PDIL<br />

24.4 Manufacturers should intimate the company, details <strong>of</strong> sample submitted<br />

for testing name <strong>of</strong> Govt. testing agency, date, contact personnel <strong>of</strong> the<br />

Govt. testing agency. At the end <strong>of</strong> the test the manufacturer should<br />

submit the test report to the company for approval. The manufacturer(s)<br />

shall be qualified based on the result <strong>of</strong> these tests and other assessment<br />

and the Company’s decision in this regard shall be final and binding on the<br />

manufacturer.<br />

Page 41 <strong>of</strong> 49

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!