04.08.2013 Views

Volume-II of IV - GAIL

Volume-II of IV - GAIL

Volume-II of IV - GAIL

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

MECON LIMITED<br />

REGD. OFF : RANCHI (BIHAR)<br />

PROCESS & PIPING<br />

DESIGN SECTION<br />

NEW DELHI<br />

STANDARD SPECIFICATION<br />

TITLE WELDING OF ONSHORE GAS<br />

SPECIFICATION NO. PAGE 38 OF 48<br />

PIPELINES<br />

MEC/S/05/62/02 REVISION<br />

ANNEXURE-I<br />

Sheet 1 <strong>of</strong> 3<br />

ELECTRODE QUALIFICATION TEST RECORD<br />

A. Tested at (Site name) Date :<br />

Manufacturer's Name :<br />

Brand Name :<br />

Batch Number & Size Tested :<br />

Classification & Code :<br />

Intended for Welding in Positions :<br />

In combination with (if any) :<br />

Code <strong>of</strong> Reference :<br />

(used for testing)<br />

Special requirements :<br />

B. All Weld Tensile Test<br />

Base Material used :<br />

Pre-heat temp. :<br />

Postweld Heat Treatment Details :<br />

Visual Examination :<br />

Radiographic Examination Results:<br />

Tensile Test Results :<br />

Sl.No. Identification No. U.T.S. Yield Point Elongation<br />

1.<br />

2.<br />

\\Akjha\work contrac\standard TS for Pipe Line WC (Vol-<strong>II</strong>) MASTER FOLDER\02A welding onshore gas pipeline\Welding <strong>of</strong> Onshore Gas Pipelines with addendum - I 02A.doc

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!