MECON LIMITED<br />

Delhi<br />

PROCESS & PIPING<br />

DESIGN SECTION<br />

TECHNICAL SPECIFICATION<br />

FOR<br />

PIPELINE CROSSINGS USING<br />

HORIZONTAL DIRECTIONAL<br />

DRILLING METHOD<br />

TECHNICAL SPECIFICATION NO. : MEC/S/05/62/75 REV-0 Page 5 <strong>of</strong> 11<br />

2.7.2. Maximum Equivalent Stress During Final Hydrostatic Test<br />

After installation, the pipeline shall be hydrostatically tested to a minimum test<br />

pressure equal to 1.4 times the design pressure or at a pressure stipulated in<br />

the Special Conditions <strong>of</strong> Contract whichever is higher. However, during<br />

hydrostatic testing, the combined equivalent stress in the pipeline due to<br />

bending and test pressure shall not exceed 90% <strong>of</strong> the SMYS <strong>of</strong> pipe material.<br />

2.7.3 Maximum Equivalent Stress During Service<br />

Permissible values <strong>of</strong> maximum equivalent stress during services shall be<br />

governed by the requirements <strong>of</strong> ANSI B 31.8/B 31.4 as applicable. The details<br />

<strong>of</strong> pipeline operating parameters are provided in the Special Conditions <strong>of</strong><br />

Contract.<br />

2.7.4 The minimum allowable radius <strong>of</strong> curvature for the pipeline shall be the<br />

highest value <strong>of</strong> the minimum pipeline elastic radius as computed from the<br />

considerations outlined in clause 2.7.1 to 2.7.3 above after correction for<br />

drilling inaccuracies or multiplication by the factor 1.85. whichever results in<br />

the highest permissible value <strong>of</strong> minimum elastic bend radius.<br />

2.7.5 Contractor shall submit all calculations for Company’s approval alongwith<br />

procedure.<br />

2.8 Pipeline Configuration along the Support String Before Entry Point<br />

2.8.3 Contractor shall determine the required pipeline configuration in order to allow<br />

smooth pull in the crossing entry point and admissible stress in the supported<br />

pipeline string. Pipeline combined stress shall not exceed 95% <strong>of</strong> the specified<br />

minimum yield strength for line pipe material.<br />

2.8.4 Contractor shall furnish all calculation and specify the number <strong>of</strong> required<br />

supports, description <strong>of</strong> the supports, their co-ordinates and capacity in metric<br />

tons.<br />

2.8.5 Contractor shall also furnish a drawing <strong>of</strong> the launching ramp indicating the<br />

pipeline configuration.<br />

2.8.6 The distance between each roller shall also be specified and justified.<br />