MECON LIMITED<br />

REGD. OFF : RANCHI (BIHAR)<br />

PROCESS & PIPING<br />

DESIGN SECTION<br />

NEW DELHI<br />

STANDARD SPECIFICATION<br />

TITLE WELDING OF ONSHORE GAS<br />

SPECIFICATION NO. PAGE 8 OF 48<br />

PIPELINES<br />

MEC/S/05/62/02 REVISION<br />

The internal line-up clamp shall not be released before the entire root pass has<br />

been completed.<br />

When as external line-up clamp is used, all spaces between bars or atleast 60%<br />

<strong>of</strong> the first pass shall be welded before the clamp is released and the pipe<br />

remaining adequately supported on each side <strong>of</strong> the joint.<br />

Segments thus welded shall be equally spaced around the circumference <strong>of</strong> the<br />

pipe. Slag, etc. shall be cleaned <strong>of</strong>f and the ends <strong>of</strong> the segments shall be<br />

prepared by grinding, so as to ensure continuity <strong>of</strong> the weld bead.<br />

09. WEATHER CONDITIONS<br />

10.0 WELDING<br />

10.1 Root Pass<br />

The parts being welded and the welding personnel shall be adequately protected<br />

from rain and strong winds. In the absence <strong>of</strong> such a protection no welding shall<br />

be carried out. The completed welds shall be suitably protected in case <strong>of</strong> bad<br />

weather conditions.<br />

a) Root pass shall be made with electrodes/ filler wires recommended in the<br />

welding specification chart attached along with other project data sheets.<br />

The size <strong>of</strong> the electrodes used shall be as per the approved welding<br />

procedure.<br />

b) Position or roll welding may be permitted. Separate procedures shall be<br />

submitted and qualified for up hill, down hill, vertical down and roll welding.<br />

The vertical up method <strong>of</strong> welding shall be sued for the root pass <strong>of</strong> the<br />

tie-ins, special crossings, fittings and special parts, filled welds, repairs<br />

and when an external line up clamp is used. The down hill welding may be<br />

used for root run welding <strong>of</strong> tie-ins and special crossings when (a) the<br />

edges are machined or have equivalent preparation (b) line up clamps are<br />

used and the fit up is geometrically and mechanically similar to one <strong>of</strong> the<br />

oridinary line welding without misalignment or uneveness.<br />

c) The root pass <strong>of</strong> butt joints shall be executed properly so as to achieve full<br />

penetration with complete fusion <strong>of</strong> the root edges. Weld projection inside<br />

the pipe shall not exceed 3mm wherever not specified by the applicable<br />

code.<br />