MECON LIMITED<br />

REGD. OFF : RANCHI (BIHAR)<br />

c:\fateh\standard\stad-eqp.wp<br />

PROCESS & PIPING<br />

DESIGN SECTION<br />

NEW DELHI<br />

STANDARD SPECIFICATION<br />

TITLE Hydrostatic Testing <strong>of</strong> Onshore Cross- SPECIFICATION NO. PAGE 8 OF 17<br />

country Pipelines<br />

MEC/S/05/62/03 REVISION A<br />

7.6 Thermal Stabilization<br />

After a check has been made to confirm if the pressure has attained at least 1 bar (g)<br />

on the highest section, thermal stabilization can be started.<br />

Thermal equilibrium between the pipeline and environment shall be checked through<br />

the thermocouples installed on the pipeline.<br />

Temperature readings shall be made at 4 hours-intervals. Thermal stabilization shall be<br />

considered to have been achieved when a difference not higher than 1°C is attained<br />

between the average values <strong>of</strong> the last two readings. Thermal stabilization completion<br />

shall be approved by COMPANY.<br />

7.7 Pressurisation<br />

Pressurisation shall be performed in the presence <strong>of</strong> COMPANY at moderate and<br />

constant rate not exceeding 2 bars/min. One pressure recording gauge shall be<br />

installed in parallel with the dead weight tester. <strong>Volume</strong> required to reach the test<br />

pressure shall be recorded periodically throughout the pressurization as follows:<br />

- each 5 bar increments up to 80% <strong>of</strong> test pressure as recorded by the dead<br />

weight tester;<br />

- each 2 bar increment between 80% to 90% <strong>of</strong> test pressure as recorded by the<br />

dead weight tester;<br />

- each 0.2 bar increment between 90% <strong>of</strong> test pressure to full test pressure as<br />

recorded by the dead weight tester.<br />

The pressurizing shall be cycled according to the following sequence:<br />

a) Pressurize to 50% <strong>of</strong> test pressure, hold pressure for 1 hour.<br />

b) Drop pressure to static head <strong>of</strong> test section at test head.<br />

c) Pressurize to 75% <strong>of</strong> test pressure, hold pressure for 1 hour.<br />

d) Drop pressure to static head <strong>of</strong> test section at the test head.<br />

e) Pressurize to test pressure.<br />

During the pressurization to each test pressure, two tests shall be carried out for the<br />

calculation <strong>of</strong> air volume in the pipeline under test.<br />

In case, during the hold pressure periods indicated above, a decrease in pressure is<br />

observed, the operations shall not be repeated more than twice, after which the line<br />

shall not be considered capable <strong>of</strong> test, until the CONTRACTOR has isolated and<br />

eliminated the cause for the lack <strong>of</strong> water tightness.