04.08.2013 Views

Volume-II of IV - GAIL

Volume-II of IV - GAIL

Volume-II of IV - GAIL

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

MECON LIMITED<br />

REGD. OFF : RANCHI (BIHAR)<br />

Document3<br />

PROCESS & PIPING<br />

DESIGN SECTION<br />

NEW DELHI<br />

STANDARD SPECIFICATION<br />

TITLE CASING INSULATORS AND END SPECIFICATION NO. PAGE 6 OF 6<br />

SEALS MEC/S/05/62/12 REVISION 0<br />

PART-C SUPPLEMENTARY REQUIREMENTS<br />

1.0 The Manufacturer shall replaces, at no extra cost, any material not conforming<br />

to the material and performance requirements <strong>of</strong> this specification.<br />

2.0 Manufacturer shall submit detailed specification <strong>of</strong> the materials used in the<br />

assemblies, along with instructions for handling, use and installation <strong>of</strong> the<br />

material for COMPANY approval prior to procurement.<br />

3.0 Manufacturer shall submit all the documents, test reports, records and other<br />

information in six copies to the COMPANY for record after approval as per<br />

clause 2.0 above.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!