MECON LIMITED<br />

REGD. OFF : RANCHI (BIHAR)<br />

PROCESS & PIPING<br />

DESIGN SECTION<br />

NEW DELHI<br />

STANDARD SPECIFICATION<br />

TITLE WELDING OF ONSHORE GAS<br />

SPECIFICATION NO. PAGE 24 OF 48<br />

PIPELINES<br />

MEC/S/05/62/02 REVISION<br />

15. ULTRASONIC INSPECTION<br />

In addition to the radiographic inspection, ultrasonic inspection is required as per<br />

conditions listed in paragraph 12.5 <strong>of</strong> this specification. This section concerns<br />

manual ultrasonic inspection. However ultrasonic by automatic equipment may<br />

be used if approved by the COMPANY.<br />

15.1 Equipment and Operators<br />

The CONTRACTOR who carries out the ultrasonic inspection shall have<br />

sufficient qualified personnel equipment and instruments at his disposal to be<br />

able to effect the tests without hindering or delaying the pipeline assembly<br />

operations.<br />

The operators shall be fully qualified as per a recognised standard (ASME Sec. V<br />

or equivalent) and they shall have as minimum level <strong>II</strong>. The operators shall be<br />

able to :<br />

calibrate the equipment ;<br />

perform an operational test under production conditions;<br />

interpret the screen picture ;<br />

evaluate the size and location <strong>of</strong> reflectors<br />

interpret the type <strong>of</strong> defects detected<br />

The COMPANY has the option <strong>of</strong> checking the ability <strong>of</strong> personnel employed for<br />

ultrasonic testing by means <strong>of</strong> qualification tests.<br />

The CONTRACTOR appointed to carry out ultrasonic inspection shall supply all<br />

the instruments necessary for their execution on site.<br />

15.2 Specification for Ultrasonic Inspection Procedure Qualification<br />

Before work beqins, the CONTRACTOR shall present a specification describing<br />

the proposed U.T. procedure qualification.<br />

This specification shall state, as an indication only but not limited to the following<br />

information :<br />

type <strong>of</strong> U.T. equipment used<br />