steel debris. Glass transition temperature differential (∆Tg) and % cure<br />

(∆H) shall comply the specified requirements.<br />

b. Epoxy Layer Thickness<br />

Epoxy layer thickness shall be checked at every one meter spacing at 3,<br />

6, 9 and 12 o’clock positions. The thickness shall comply the specified<br />

thickness requirements.<br />

c. Adhesive Layer Thickness<br />

Adhesive layer thickness shall be checked at every one meter spacing at<br />

3, 6, 9 and 12 o’clock positions. The thickness shall comply the specified<br />

thickness requirements.<br />

d. Holiday Inspection<br />

Entire pipe shall be subject to holiday inspection and the test voltage<br />

shall be set to exceed 5 v/micron <strong>of</strong> epoxy thickness specified for the<br />

portion coated only with epoxy layer.<br />

e. Adhesion Test<br />

i) Adhesion Test (24 hrs or 48 hrs) shall be carried out on the epoxy<br />

coated pipe. Test method, no. <strong>of</strong> test specimen and acceptance<br />

criteria shall comply CSA Z.245,20-98, Table 4.<br />

ii) Adhesion <strong>of</strong> FBE shall also be separately determined at ambient<br />

temperature at two locations by the “St Andrews Cross” method<br />

and the test shall comply with the specified requirements.<br />

f. 2.5° Flexibility Test<br />

2.5° Flexibility test shall be carried out on the epoxy coated pipe at test<br />

temperature <strong>of</strong> 0°C. Test method, no. <strong>of</strong> test specimen and acceptance<br />

criteria shall comply CSA Z.245,20-98, Table-4.<br />

g. Cross-section & Interface Porosity Test<br />

Cross section porosity and interface porosity tests shall be carried out on<br />

the epoxy coated pipe. Test method, no. <strong>of</strong> test specimen and<br />

acceptance criteria shall comply CSA Z.245,20-98, Table-4.<br />

7.5.2 Tests on pipes coated only with all three layers<br />

a. Bond Strength<br />

Three test pipes shall be selected for bond strength tests. On each <strong>of</strong> the<br />

selected pipes, three bond strength test shall be performed for each<br />