MECON LIMITED<br />

REGD. OFF : RANCHI (BIHAR)<br />

Document6<br />

PROCESS & PIPING<br />

DESIGN SECTION<br />

NEW DELHI<br />

TITLE MAINLINE CONSTRUCTION<br />

(ONSHORE)<br />

STANDARD SPECIFICATION<br />

SPECIFICATION NO. PAGE 40 OF 53<br />

MEC/S/05/62/01 REVISION A<br />

11.6 In connecting pipes, special items, fittings and equipment where different wall<br />

thickness are to be welded, CONTRACTOR shall follow the procedures<br />

indicated in ANSI B31.8/ANSI B31.4, as applicable. The required tapering shall<br />

be done by CONTRACTOR at no extra cost to COMPANY.<br />

11.7 For tie-in <strong>of</strong> adacent sections <strong>of</strong> pipeline already pressure tested, the pup used<br />

for tie-in shall be <strong>of</strong> single length or <strong>of</strong>f-cuts <strong>of</strong> pipe which have already been<br />

hydrostatically tested. CONTRACTOR shall take care that sufficient number <strong>of</strong><br />

pretested pipes with different wall thicknesses are readily available.<br />

12.0 SPECIAL INSTALLATIONS ON THE PIPELINE.<br />

12.1 General<br />

12.1.1 In addition to constructing the pipeline, CONTRACTOR shall also install certain<br />

other auxiliary facilities and appurtenances.<br />

CONTRACTOR shall do all work necessary at each <strong>of</strong> the installations to<br />

provide facilities which are complete in all respects and ready for operation.<br />

Without limiting the generality there<strong>of</strong>, the work required to complete the<br />

installations shall, where applicable, include all site surveys, site preparation,<br />

filling, grading, fencing, foundations, installation <strong>of</strong> block valves, side valves,<br />

pipework, pipe supports, pressure gauges, mechanical facilities, civil work,<br />

painting, installation <strong>of</strong> all electrical equipments, motors, cables, conduIt, wiring<br />

and fixtures and hooking up <strong>of</strong> same; installation <strong>of</strong> all instruments, piping,<br />

valves and fittings; mount all instruments and make all piping and electronic<br />

connections, etc.<br />

On completion, all elements <strong>of</strong> each installation shall be checked our and tested<br />

for full and correct operation in the presence <strong>of</strong> and to the satisfaction <strong>of</strong><br />

COMPANY. All work shall be carried our strictly in accordance with the<br />

appropriate codes, the approved drawings, and this and other related<br />

specifications.<br />

CONTRACTOR shall fabricate all piping and install valves and fittings as<br />

required by the detailed engineering drawings prepared by him and approved by<br />

COMPANY.