D060<br />

Edward W. Chance Reserve Hydr. Rest.<br />

Project Type SOR<br />

AOR(s)<br />

Natural Systems<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

Project Manager RHINESMITH, PHILIP<br />

Task Manager(s)<br />

Status Cancelled<br />

THORNTON, SHELLEY<br />

Description<br />

The District's Governing Board approved the Hydrologic and Wetlands Restoration of District-Owned Lands initiative at<br />

their January 2004 meeting. The project focuses on 2 goals which are: A) recovering the functions of water storage<br />

and conveyance in impacted wetlands and streams; and B) recapturing the benefits of water quality and wildlife habitat<br />

formerly provided by the impacted system in its undisturbed state. To accomplish this goal, the District will retain the<br />

engineering and environmental services of PBS&J to complete a feasibility and alternatives analysis for the site. The<br />

restoration site is located in the District's Edward W. Chance Reserve (formerly known as the Rutland Ranch). The<br />

property is currently managed by the District for passive recreation and natural resource protection. There are many<br />

isolated wetlands throughout the project area. The impacts to wetland systems are a result of linear ditches<br />

constructed to facilitate drainage off-site thereby improving lands for row crops.<br />

Benefits<br />

The project will recover the functions of water storage and conveyance of Gilley Creek and numerous isolated<br />

herbaceous wetlands and recapture the benefits of water quality and wildlife habitat formerly provided by the impacted<br />

system in its undisturbed state.<br />

Costs<br />

The design and permitting for the project will be initiated in FY2009 at an estimated cost of $75,000 and construction<br />

in FY2008-09 using the remainder of the FY2007 funds and an additional $<strong>10</strong>8,934 for a total of $386,557. The<br />

FY2009 budget is for permit fees, District staff time, travel and central garage charges. The total project cost is<br />

expected to be $450,000. These activities are reimbursed at <strong>10</strong>0 percent from the Florida Department of<br />

Transportation Mitigation Program. Previous funding can be found in project SB19.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

024 FDOT Mitigation 0 0 0 260,283<br />

0 260,283<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$260,283<br />

Critical Project Milestones Projected Amended Actual<br />

1. RFP, Consultant Selection & Contract<br />

RFP-CCNA Submitted 4/30/04 6/16/04<br />

Presentations 6/30/04 6/30/04<br />

Consultant Notification 7/24/04 7/24/04<br />

Project Assigned to Consultant <strong>10</strong>/31/04 8/26/04<br />

Contract Routing 11/1/04 <strong>10</strong>/13/04<br />

Contract Signed by Consultant 11/30/04 9/1/05<br />

Contract Fully Executed 5/31/05 9/<strong>21</strong>/05<br />

2. Critical Project Milestones<br />

Feasibility and Analysis Report Complete 6/30/06 8/31/06 2/1/08<br />

Design Complete 12/31/06 <strong>10</strong>/31/09<br />

Permitting Commence 1/31/07 12/31/09<br />

Permitting Complete 3/31/07 1/30/<strong>10</strong><br />

Construction Commence 4/1/07 2/28/<strong>10</strong><br />

0<strong>21</strong> - Manasota Basin 27