H059<br />

City of Bradenton Reservoir Expansion<br />

Project Type WS&R Dev.<br />

AOR(s)<br />

Water Supply<br />

Basin(s) General Fund (District), Manasota<br />

Cooperator(s)<br />

City of Bradenton<br />

Project Manager MORRIS, LISANN<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This is an ongoing Cooperative Funding project requested by the City of Bradenton to develop an alternative water<br />

supply project that will provide additional storage capacity at the Bill Evers Reservoir and capture excess flow from the<br />

Braden River during the wet season's high flow periods. The project is for the design, permitting and construction of an<br />

upland, offstream storage facility on City-owned property adjacent to the City's water supply reservoir. The requested<br />

FY20<strong>10</strong> funding will be used toward construction of the reservoir though the contract end date will be extended due to<br />

delays in final geotechnical analysis. The proposed facility would be made of earthen dike construction. The Project<br />

includes a raw water intake at the existing reservoir plus pumping and piping for filling the new storage facility; systems<br />

to provide turnover and prevent stratification and stagnation of water in the new storage facility; and equipment and<br />

piping for withdrawing water from the new storage facility.<br />

Benefits<br />

The City plans to increase the size of the reservoir storage area from 580 to 755 million gallons because of the<br />

uncertainty of arsenic mobilization and ASR. Without ASR, the projection for raw water supply capacity must increase<br />

to 2.62 MGD from 2.15 MGD to meet demands through 2025. In their cooperative funding application, the City stated<br />

that if ASR proves to be a viable option for treated water storage, the City will have excess water available to<br />

participate in a regional water supply effort.<br />

Costs<br />

The estimated cost for the H059 Raw Water Storage is $17,372,000 with the District share at $8,686,000. District<br />

funding in FY20<strong>10</strong> is divided as follows: General fund $1,003,000; Manasota $1,003,000. Water Protection and<br />

Sustainablility Trust Funds in the amount of $43,541 were transferred into the project. These funds will be split evenly<br />

between the District and City decreasing construction costs accordingly. When each phase (such as<br />

design\permitting) is completed the project budget and scope and schedule may require refinement based on the<br />

information gathered.<br />

Additional Information<br />

At their March 2006 meeting, the Governing Board established a policy regarding Cooperative Funding for potable<br />

water supply projects submitted by local governments in areas served by a water supply authority (WSA). Funding<br />

criteria is dependent on whether or not the local government is a member\customer of the WSA. The City of<br />

Bradenton is located in the service area of the Peace River/Manasota Regional Water Supply Authority (Authority), but<br />

is not a member of the Authority. The City must coordinate their water supply needs with the Authority so that they are<br />

consistent with regional plans. Affirmative written documentation from the Authority supporting the project must<br />

accompany the City's application. The Authority supplied a written statement in early May 2006 indicating coordination<br />

with the City and consistency of the project with the Authority's regional plan. This project is also consistent with the<br />

SWUCA Recovery Plan in providing water supply from an alternative source (surface water), and has the potential to<br />

reduce demand on the Upper Floridian aquifer.<br />

0<strong>21</strong> - Manasota Basin <strong>21</strong>8