W620<br />

Pelican Cove Stormwater Retrofit<br />

Agreement Sent to Cooperator 9/30/08 12/18/08 4/30/09<br />

Signed Agreement Returned from Cooperator <strong>10</strong>/28/08 5/12/09<br />

Agreement Fully Executed 11/11/08 5/22/09<br />

Notice to Proceed 11/17/08 6/8/09<br />

Critical Project Milestones<br />

Complete Project Design and Permitting 12/31/09<br />

Complete Construction 12/31/<strong>10</strong><br />

Agreement Expiration 12/31/12<br />

Status As Of: August 26, 2009<br />

The Pelican Cove Condominium Association provided a Scope of Work in August 2008 and a preliminary draft<br />

Agreement for the project was sent to both Sarasota County and the Association in September 2008. The final<br />

agreement was forwarded to Sarasota County for signatures in December 2008. In lieu of entering into the tri-party<br />

agreement, the County Water Resource Manager stated that the County ordinance, Stormwater Conveyance<br />

Maintenance, provides for the County to enforce maintenance of private stormwater drainage systems. The revised<br />

Agreement between Pelican Cove and the District was executed May 22, 2009 and Notice to Proceed was issued June<br />

8, 2009. Pelican Cove contracted with a consultant to design the project and design is under way.<br />

0<strong>21</strong> - Manasota Basin <strong>10</strong>4