B063<br />

USGS Manasota Basin Surface Water Flow, Level, and Water<br />

Quality Data Collection<br />

Prior Cumulative FY 2009 FY20<strong>10</strong><br />

Funding Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

887,995 0 <strong>10</strong>8,500<br />

0<br />

011 Alafia River Basin 0 996,495<br />

013 Hillsborough River Basin 1,316,655 0 1<strong>21</strong>,600<br />

0<br />

0 1,438,255<br />

014 Northwest Hillsborough Basin 227,774 0 44,700<br />

0<br />

0 272,474<br />

015 Coastal Rivers Basin 1,489,207 0 243,900<br />

0<br />

0 1,733,<strong>10</strong>7<br />

016 Pinellas-Anclote River Basin 397,932 0 57,<strong>10</strong>0<br />

0<br />

0 455,032<br />

019 Withlacoochee River Basin 1,630,847 0 296,880<br />

0<br />

0 1,927,727<br />

020 Peace River Basin 2,295,165 0 434,900<br />

0<br />

0 2,730,065<br />

0<strong>21</strong> Manasota Basin 1,036,520 0 231,900<br />

0<br />

0 1,268,420<br />

Project Funds Not Budgeted by the<br />

District<br />

USGS Alafia River Basin 585,822 0 0<br />

0<br />

0 585,822<br />

USGS Coastal Rivers Basin 409,438 0 0<br />

0<br />

0 409,438<br />

USGS Hillsborough River Basin 675,390 0 0<br />

0<br />

0 675,390<br />

USGS Manasota Basin 202,806 0 0<br />

0<br />

0 202,806<br />

USGS Northwest Hillsborough Basin 23,690 0 0<br />

0<br />

0 23,690<br />

USGS PA Basin 202,338 0 0<br />

0<br />

0 202,338<br />

USGS Peace River Basin 1,356,566 0 0<br />

0<br />

0 1,356,566<br />

USGS Withlacoochee River 789,429 0 0<br />

0<br />

0 789,429<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$15,067,054<br />

Critical Project Milestones Projected Amended Actual<br />

Install Stage/Conductance site Manatee R @ Ft. Hamer <strong>10</strong>/1/00 1/24/01<br />

Install Stage/Conductance site on Manatee R @ Devil's Elbow <strong>10</strong>/1/00 1/26/01<br />

Install two new stage sites on Myakka River 4/30/02 7/9/02<br />

Install three new tidal stage/conductance sites on Myakka River 4/30/02 1/31/03 1/31/03<br />

Install two new stage sites on Braden River 4/30/02 5/1/03 3/31/02<br />

Install fourth tidal stage/conductance site on Myakka River <strong>10</strong>/1/02 5/1/03 3/28/03<br />

Install two stage/discharge sites on Cow Pen Slough <strong>10</strong>/1/02 5/1/03 4/30/03<br />

Install two new tidal stage/conductance sites on Donna/Roberts Bay <strong>10</strong>/1/02 5/1/03 5/15/03<br />

Site Installation Cancelled<br />

Install new water level gauging station on Gamble Creek <strong>10</strong>/1/01<br />

Status As Of: August <strong>21</strong>, 2009<br />

FY2009 data collection is ongoing, with no problems to report. The District's FY2009 commitment to the project is<br />

$231,900, of which $115,950 has been expended (the USGS bills us every six months for these activities).<br />

Accelerated Action-To-Date: On-time<br />

0<strong>21</strong> - Manasota Basin 120