L611<br />

Sarasota County - Watershed Plan: Roberts Bay<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

Sarasota County<br />

Project Manager LOPEZ, MANNY<br />

Task Manager(s)<br />

Status Ongoing<br />

HEYL, MIKE, GARCIA, LIZANNE<br />

Description<br />

The purpose of this project is to develop a comprehensive Watershed Plan for Roberts Bay. The plan will focus on<br />

water resources issues such as restoration of historic or more natural hydrologic regimes in Roberts Bay, and<br />

improvements to water quality and habitat restoration. The plan will attempt to identify ways to reduce flow volumes<br />

into the Bay, and thereby assist in reducing pollutant loads and improving water quality. The Roberts Bay watershed<br />

includes two localities of concern with regard to documented declining water quality trends: Increasing trends of<br />

historic chlorophyll a levels at Roberts Bay, and elevated nutrient levels based on Trophic State Index (TSI) for West<br />

Clark Lake. Conditions at both of these localities indicate a need to reduce nutrient loading from the watershed. An<br />

essential element of the project will be updating and improving the existing AdICPR flood model and pollutant loading<br />

model.<br />

Benefits<br />

Development of the plan will allow the County to consolidate and update goals and objectives from the District's SWIM<br />

Plan and the Sarasota Bay Estuary Program (SBEP) into one strategy that would include comprehensive monitoring of<br />

water quality and pollutant loads, detailed mapping, flood and pollutant load modeling, and prioritized practical project<br />

proposals to improve water quality, restore natural run-off regimes, provide water supply, and protect natural<br />

resources.<br />

Costs<br />

The total cost for plan development is $600,000. The District's share is $300,000, and the County's share is $300,000.<br />

The District's share is funded by the Manasota Basin Board over two fiscal years: FY2007 ($150,000) and FY2008<br />

($150,000). The FY2007 budget is $300,000, with the District and County each contributing half ($150,000). For<br />

FY2007, the District's share is split between the Manasota Basin Board ($75,000) and the State's Water Protection<br />

and Sustainability Trust Fund ($75,000). The FY2008 budget is $300,000 with the County and the District each<br />

contributing half ($150,000). The District's FY2008 share is funded entirely by the Manasota Basin Board. The District<br />

funding amounts shown in the table include staff salaries, travel and central garage charges.<br />

Additional Information<br />

Development of the plan will include formation of a watershed stakeholders group working through the Neighborhood<br />

Environmental Stewardship Team (NEST) program to encourage public participation in the process. The completed<br />

plan will be presented to the Board of County Commissioners for adoption, and will include short term and long term<br />

projects for improvements that may include wastewater reuse, stormwater reuse, smart growth, revised land<br />

development standards, sediment control, wetland or floodplain restoration, flood level abatement, aquifer protection,<br />

and restoration of natural flow regimes.<br />

0<strong>21</strong> - Manasota Basin 294