(Withdrawn) Bradenton - MARS Reuse Interconnection Project<br />

Start Construction 2/15/<strong>10</strong><br />

Complete Construction 6/30/11<br />

Status As Of: February 27, 2009<br />

District staff has drafted the agreement and has been waiting for the results of the Bradenton/Manatee Co./Palmetto<br />

Reuse Interconnect Study (L854), before finalizing the agreement. The preliminary results of that study indicates the this<br />

project is not desired. The study points out that the MARS sytem only needs additional reclaimed water supply during<br />

some periods in the dry system. Manatee County does not want to commit to take specified quantities for any set<br />

periods. The City of Bradenton has excess reclaimed water supply and needs to have a dependable customer to<br />

beneficially utilize that reclaimed water. Interconnecting the City of Bradenton's reclaimed water system with the County's<br />

MARS System will not produce the benefit anticipated. The City of Bradenton has requested to withdraw this project.<br />

0<strong>21</strong> - Manasota Basin 343