H087<br />

City of Punta Gorda Reverse Osmosis Facility<br />

Project Type WS&R Dev.<br />

AOR(s)<br />

Water Supply, Water Quality, Natural Systems<br />

Basin(s) General Fund (District), Peace River, Manasota<br />

Cooperator(s)<br />

City of Punta Gorda<br />

Project Manager FERGUSON, JOHN<br />

Task Manager(s)<br />

MORRIS, LISANN<br />

Status Proposed<br />

Description<br />

This project is a Reverse Osmosis (RO) facility to be co-located with the City of Punta Gorda's existing <strong>10</strong> mgd water<br />

treatment facility. The RO facility would provide 2 mgd of treated brackish groundwater for blending with treated<br />

surface water to reduce levels of Total Dissolved Solids (TDS). This project would also provide water to the four county<br />

region (Charlotte, Sarasota, Desoto, and Manatee) through the Peace River Manasota Regional Water Supply<br />

Authority's Phase 1A Interconnect (H069). Project components would include final design\permitting and construction.<br />

Benefits<br />

Construction of the RO facility for brackish groundwater treatment will provide a blending source to reduce levels of<br />

TDS, which would improve the quality and seasonal reliability of the surface water treatment facility. The brackish<br />

water could be used as an alternative source and could potentially serve as a future recovery strategy for proposed<br />

MFLs on Shell Creek. The City has indicated in their application this water would be available to the Peace River<br />

Manasota Regional Water Supply Authority.<br />

Costs<br />

The City estimated the total project cost at $36,700,000. The City budgeted $1,000,000 in FY2009 for the project, prior<br />

to submitting a District funding request. The total District eligible cost through construction is estimated at<br />

$35,700,000, with $17,850,000 in funding requested. The anticipated District FY20<strong>10</strong> funding is scheduled as:<br />

Governing Board $1,000,000, Manasota Basin Board $500,000, and the Peace River Basin Board $270,000.<br />

Additional Information<br />

The City currently has an interlocal agreement to transfer 1 mgd under the Authority's GAP permit. The GAP permit<br />

expires on January 30, 2013. This project, along with the development of an off-line reservoir, are under examination<br />

as part of an MFL recovery strategy for Shell Creek. The 2 mgd RO facility may employ some of the City's existing<br />

ASR wells transitioned into brackish water supply wells. A deep injection well will be required to dispose of RO<br />

concentrate. The treated groundwater will be used conjunctively with surface water when TDS levels are high during<br />

periods of drought. The RO facility may be incrementally expanded to 8 mgd in future phases, based on the<br />

permittability of brackish groundwater sources. Additional aquifer performance data will be required to determine total<br />

groundwater availability in the area. Future phases of the RO facility may also be designed for the treatment of surface<br />

water with high TDS levels.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 0 0 0 1,004,694 7,925,000 8,929,694<br />

020 Peace River Basin 0 0 0 272,607 2,139,750 2,412,357<br />

0<strong>21</strong> Manasota Basin 0 0 0 503,763 6,015,250 6,519,013<br />

Project Funds Not Budgeted by the<br />

District<br />

City of Punta Gorda 0 0 1,000,000 2,000,000 14,850,000 17,850,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$35,711,064<br />

Critical Project Milestones Projected Amended Actual<br />

020 - Peace River Basin 231