B243<br />

Long-Term Water Budget Analysis of Lake Starr, Polk County<br />

Florida<br />

Project Type Basin Initiatives<br />

AOR(s)<br />

Water Supply<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

United States Geological Survey<br />

Project Manager BEACH, MICHAEL<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

The purpose of this cooperative project between the U.S. Geological Survey (USGS) and the District is to analyze the<br />

effects of rainfall and ground-water levels on the lake levels of Lake Starr over a wide range of conditions. This lake is<br />

a 134-acre seepage lake located on the Lake Wales Ridge within the Peace River Basin, about four miles north of<br />

Lake Wales. The project will be based on a <strong>10</strong>-year data set.<br />

Benefits<br />

It is believed that rainfall most affects lake levels when rainfall is above normal. It is also believed that ground-water<br />

levels most affect lake levels when rainfall is generally normal to low and ground-water levels are low due to pumping.<br />

However, if the District is to responsibly manage water resources, it is imperative that the District be able to verify and<br />

quantify these relationships. This ten-year dataset provides the District and the USGS with an extremely wide range of<br />

rainfall and lake level conditions, and the opportunity to significantly improve on the previous work. Additionally, the<br />

developed relationships between rainfall and ground-water levels versus lake levels will provide a measure against<br />

which simpler statistically-based models can be tested in the future.<br />

Costs<br />

The cost of the project is $600,000, to be shared equally between the USGS and the Peace River Basin Board. The<br />

project will take three years to complete, October 2006 through September 2009. District costs for FY2009 will be<br />

$<strong>10</strong>0,000 and will complete the District obligation to this project.<br />

Additional Information<br />

The USGS previously did an analysis on this lake for the 2-year period August 1996 through July 1998. During that<br />

period rainfall was 50.68 inches and 54.04 inches, respectively. These rainfall amounts are very close to the long term<br />

annual average of 51.99 inches. Lake levels during that time fluctuated between <strong>10</strong>3.9 feet and <strong>10</strong>6.6 feet , NGVD: a<br />

range of less than three feet. Since that time, the USGS has continued collecting data: lake levels, ground-water<br />

levels, rainfall, and evaporation. There are now ten years of data that include periods of extreme drought as well as<br />

periods of considerable rainfall. Lake levels over that time have fluctuated between 96.3 to <strong>10</strong>9.8 feet, NGVD: a range<br />

of over 13 feet. Analysis of the extended data will provide a better understanding of the contribution to lake levels from<br />

groundwater, rainfall, and evaporation at the extreme ends of the rainfall and lake level ranges.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin 2<strong>10</strong>,486 0 <strong>10</strong>4,859<br />

0<br />

0 315,345<br />

Project Funds Not Budgeted by the<br />

District<br />

USGS 200,000 0 <strong>10</strong>0,000<br />

0<br />

0 300,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$615,345<br />

Critical Project Milestones Projected Amended Actual<br />

Agreement Completed <strong>10</strong>/1/06 12/12/06<br />

Analytic Water Budget and Analysis 9/30/07 2/22/08<br />

Report Preparat & Review 3/31/08<br />

020 - Peace River Basin 116