H009<br />

Lake Hancock Outfall Structure P-11 Modification<br />

Project Type WS&R Dev.<br />

AOR(s)<br />

Flood Protection, Natural Systems<br />

Basin(s) General Fund (District), Alafia River, Peace River, Manasota<br />

Cooperator(s)<br />

Project Manager LETASI, SCOTT<br />

Task Manager(s)<br />

Status Ongoing<br />

LETASI, SCOTT, GANUN, JIM, BARTLETT, MIKE<br />

Description<br />

Funding under Project H009 is provided for the replacement of the Lake Hancock P-11 Water Control Structure. This<br />

project is directly related to Project H008, Lake Hancock Lake Level Modification. Project H009 is contingent on the<br />

successful completion of Project H008 in 3 steps: Step (1) provide the preliminary evaluations and incremental<br />

probable costs for raising the normal high operating levels of Lake Hancock to 99.5, <strong>10</strong>0.0, and the target <strong>10</strong>0.5 feet<br />

from the current level of 98.7 feet. Step (1) is complete with a recommended target level up to <strong>10</strong>0.0 feet. The results<br />

of Step 1 were presented to the boards with a staff recommendation for moving forward with Step (2) of the project in<br />

October 2004. Step (2) involves the generation of the detailed information necessary to submit a complete Conceptual<br />

Environmental Resource Permit (ERP) Application, and to specifically identify impacts to private lands for acquisition<br />

and other mitigation needs (environmental, facilities, etc). Major components of the Conceptual ERP include: pre and<br />

post condition analysis; private property, dwelling, environmental, and infrastructure mitigation; outfall structure<br />

operation characteristics; and an anticipated fluctuation schedule for the Lake. Step (3) is the implementation of the<br />

mitigation components as specified in the Conceptual ERP. Costs for design, ERPs, and construction for<br />

environmental and infrastructure mitigation requirements have not been determined. Once these steps have been<br />

completed, construction documents will be completed for the replacement of Structure P-11 and the District will post a<br />

request for bids. Funding for this project is shared by the Governing Board (50 percent), Peace River Basin Board (25<br />

percent), Alafia River Basin Board (12.5 percent) and Manasota Basin Board (12.5 percent). Basin Board funding<br />

percentages are based on Alafia, Manasota, and Peace Basin impacts to the loss of flows in the Upper Peace River<br />

Watershed from ground-water withdrawals.<br />

Benefits<br />

Raising the normal operating water level of Lake Hancock to <strong>10</strong>0.0 feet NGVD will provide the storage to meet<br />

approximately 50% of the Minimum Flows and Levels Requirements of the upper Peace River. It was also determined<br />

that raising of the operating level along with other District projects will help restore wetland function for several hundred<br />

acres of contiguous lands to Lake Hancock. Project H009 will involve the actual replacement of the present control<br />

structure to achieve these goals.<br />

Costs<br />

The probable cost are projected to be a total of $5,000,000 for this structural replacement project. This cost does not<br />

include any land acquisition costs. Funds encumbered under Project H009 were approved in FY2003 in the amount of<br />

$2,500,000 and an additional $2,500,000 was approved in the FY2009 for implementing the structure replacement<br />

project. The FY2009 funds are from the West Central Florida Water Restoration Action Plan FY2009 State funds. The<br />

FY2003 and FY2009 funds do not include any land acquisition cost.<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 1,250,000 0 0 2,473<br />

0 1,252,473<br />

011 Alafia River Basin 312,500 0 0 825<br />

0 313,325<br />

020 Peace River Basin 625,000 0 0 825<br />

0 625,825<br />

0<strong>21</strong> Manasota Basin 312,500 0 0 825<br />

0 313,325<br />

District Budgeted - Outside Revenue<br />

State Approp - WRAP - Prior Year<br />

Funds<br />

Prior<br />

Funding<br />

0<strong>21</strong> - Manasota Basin 202<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

0 0 2,500,000<br />

0<br />

Total:<br />

Future<br />

Funding<br />

0<br />

Total<br />

Funding<br />

2,500,000<br />

$5,004,948