H084<br />

Arcadia-DeSoto Interconnect<br />

Finalize Interconnect Agreement <strong>10</strong>/1/09<br />

Complete Interconnect Design <strong>10</strong>/30/09<br />

Execute agreement with District <strong>10</strong>/30/09<br />

Begin Construction 1/4/<strong>10</strong><br />

Activate Interconnect 3/1/<strong>10</strong><br />

Status As Of: August 31, 2009<br />

The City has authorized Hazen and Sawyer as the project consultant. The consultant is currently preparing the<br />

preliminary design report. The City of Arcadia and DeSoto County are currently developing their interlocal agreement for<br />

the transfer/purchase of water.<br />

020 - Peace River Basin 228