L624<br />

Venice Imp. BMPs Hatchett Creek-Venice<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Flood Protection, Water Quality<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

City of Venice<br />

Project Manager PRATER, CORRINA<br />

Task Manager(s)<br />

Status Ongoing<br />

NORTON, NANCY<br />

Description<br />

This project is to perform the Implementation of Best Management Practices (BMPs) element of the District's<br />

Watershed Management Program (WMP) for the Hatchett Creek Watershed in Sarasota County. This BMP will be<br />

implemented in the Venice Avenue improvement area. The existing stormwater system on Venice Avenue, U.S.41<br />

Bypass and Warfield Avenue is undersized and causes flooding of the roadways. Venice Avenue and U.S. 41 Bypass<br />

are evacuation routes and Warfield Avenue is an access road for the City of Venice Utilities Department, water<br />

treatment plant and area businesses. Extensive flooding has caused the closure of the Warfield Avenue and U.S. 41<br />

Bypass intersection 3 to 4 times a year when daily rainfall exceeds 3 inches. The proposed stormwater system will be<br />

designed to a <strong>10</strong>0-year, 24-hour rainfall event. The existing stormwater system on Warfield Avenue will be enlarged<br />

and replaced with new pipe, curb inlets and outfall pipes. Two additional curb inlets and connector pipes will be added<br />

at the intersection of U.S. 41 Bypass and Venice Avenue. In addition, stormwater will be directed to the retention pond<br />

at East Venice Avenue and Warfield Avenue. The existing pond may require modification due to the added water<br />

volume being treated. The proposed BMP will address level of service deficiencies. With FY2007 funding the work on<br />

the Implementation of BMPs will begin and includes the following tasks: evaluation, design, development of<br />

construction documents, construction permitting, bidding and contractor selection, and construction of the BMPs.<br />

Benefits<br />

The project will improve level of service deficiencies by improving conveyance and providing additional storage within<br />

the watershed. The project is also expected to improve water quality by increasing residence times in the storage area.<br />

Repairing the damaged stormwater pipes that are seeping sediment into the system and Hatchett Creek outfall will<br />

enhance stormwater quality.<br />

Costs<br />

The total budget amount for this project is $351,670, of which the District's share is $175,835. The District's share is<br />

being funded entirely by the Manasota Basin. The City is contributing $175,835 over FY2007 and FY2008. When each<br />

task is completed the project budget may require refinement based on the information gathered. The District funding<br />

amounts shown in the table include staff salaries, travel and central garage charges.<br />

Additional Information<br />

The WMP includes five major elements: 1) Topographic Information, 2) Watershed Evaluation, 3) Watershed<br />

Management Plan, 4) Implementation of BMPs, and 5) Maintenance of Watershed Parameters and Models.<br />

Implementing elements of the WMP with local governments is one of the Comprehensive Watershed Management<br />

(CWM) initiative strategies. Future funding to complete the project will be provided by the City that will satisfy its<br />

cooperative funding match requirements. The City will manage the project, where the District project manager must<br />

approve any agreements to accomplish project tasks.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 179,805 0 6,490 3,947<br />

0 190,242<br />

Project Funds Not Budgeted by the<br />

District<br />

City of Venice 175,835 0 0<br />

0<br />

0 175,835<br />

0<strong>21</strong> - Manasota Basin 308<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$366,077