W613<br />

Sarasota-Catfish Creek SW Facility-Phase II<br />

Project Type SWIM<br />

AOR(s)<br />

Water Supply, Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

Project Manager LOPEZ, MANNY<br />

Task Manager(s)<br />

Status Ongoing<br />

Sarasota County, Sarasota County Watershed Management<br />

THORNTON, SHELLEY<br />

Description<br />

This FY2005 project is to implement Best Management Practices (BMPs) for the Catfish Creek Watershed which<br />

drains into Sarasota Bay, a District SWIM waterbody. The Catfish Creek watershed covers an area of approximately<br />

6.22 square miles and is located in Sarasota County. Implementation of BMPs includes design, development of<br />

construction documents, construction permitting, land acquisition, bidding, contractor selection, construction of the<br />

BMPs and construction engineering and inspection. Current plans call for the construction of one stormwater treatment<br />

pond totaling 23.75 acres. The County's prior funding includes the property purchased by the County for the project.<br />

With FY2005 funding budgeted and additional funding requested in FY2008, work on the Implementation of BMPs will<br />

be completed and includes the following tasks: construction of the BMPs and construction engineering and inspection.<br />

Benefits<br />

The combined pond acreage will be sufficiently large that stormwater runoff from approximately 8<strong>10</strong> acres of<br />

watershed will receive adequate treatment to meet design criteria for existing stormwater regulations and will improve<br />

water quality by increasing residence time.<br />

Costs<br />

The total current projected project cost is $9,903,703, which includes land costs to date of $1,788,129 with additional<br />

lands remaining to be acquired. The District's share in FY2005 was $2,500,000 split 40/60 between the Manasota<br />

Basin Board ($1,000,000) and State SWIM ($1,500,000). Sarasota County's share in prior years was $6,229,949 in<br />

addition to an FDEP grant for $504,413. Sarasota County will contribute $275,000 to the project in FY2008 with the<br />

District providing a matching contribution shared evenly between the Manasota Basin Board ($137,500) and State<br />

SWIM ($137,500). The County requested the final $275,000 in FY2009 (shared evenly between the Manasota Basin<br />

Board ($137,500) and State SWIM ($137,500)) and will contribute an equal amount. The total District funding<br />

reflected in the table below includes staff salary, travel and central garage costs.<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 1,156,189 140,714 2,734<br />

0 1,299,637<br />

District Budgeted - Outside Revenue<br />

State Trust Funds (SWIM) 150,451 140,714<br />

0<br />

0 291,165<br />

State Trust Funds (SWIM) - Prior 2006 1,500,000 0<br />

0<br />

0 1,500,000<br />

WMLTF (SWIM) - Prior Year Funds 0 0 2,734<br />

0 2,734<br />

Project Funds Not Budgeted by the<br />

District<br />

Florida Department of Environmental<br />

Protection<br />

Prior<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding Funding<br />

504,413 0<br />

0<br />

0<br />

504,413<br />

Sarasota County 6,504,949 275,000<br />

0<br />

0 6,779,949<br />

0<strong>21</strong> - Manasota Basin 91<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$<strong>10</strong>,377,898