City of Lakeland Pre-Rinse Spray Valve Retrofit Project<br />

Final Report to District 1/1/<strong>10</strong><br />

Program closeout 1/31/11<br />

Status As Of: September 01, 2009<br />

Installation of the pre-rinse spray valves ended on 12/31/2008. A total of 252 pre-rinse spray valves have been installed<br />

for a total District cost of $16,632.00. $5,868 remains in the budget. The final report is in the process of being completed.<br />

Action-to-date: On time<br />

020 - Peace River Basin 311