10.12.2012 Views

MANASOTA & PEACE RIVER BBDs Meeting Notebook 10-21-09.docx

MANASOTA & PEACE RIVER BBDs Meeting Notebook 10-21-09.docx

MANASOTA & PEACE RIVER BBDs Meeting Notebook 10-21-09.docx

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

W798<br />

Winter Haven Downtown Watershed Improvement Plan<br />

Project Type SWIM<br />

AOR(s)<br />

Water Supply, Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Winter Haven<br />

Project Manager THORNTON, SHELLEY<br />

Task Manager(s)<br />

Status Ongoing<br />

SZAFRANIEC, MARY<br />

Description<br />

This project is in response to a FY20<strong>10</strong> cooperative funding request from the City of Winter Haven and Polk County.<br />

The project will incorporate Low Impact Development (LID) and stormwater Best Management Practices (BMPs) into<br />

the City's lakes management goals thereby improving the water quality of runoff entering surface water and the<br />

surficial aquifer. The project will result in improved stormwater treatment over traditional design methods through the<br />

installation or creation of rain gardens, improved swales, small isolated wetlands and other passive treatment methods<br />

within the downtown area of the City of Winter Haven and the outlying neighborhoods. The project will prioritize those<br />

areas based upon cost, water quality/environmental benefit, permitability, and practicality for construction. Finally,<br />

selected areas will then be brought forward for the design, permitting and construction of BMP's, following concepts of<br />

LID, in an effort to reduce nutrient concentrations in the Chains of Lakes.<br />

Benefits<br />

Most of downtown Winter Haven is located within the Northern and Southern Chain of Lakes watersheds, which are<br />

Surface Water Improvement and Management (SWIM) priority waterbodies. The Chains of Lakes are composed of 24<br />

interconnected lakes within and around the City of Winter Haven in north central Polk County. Hydrologic changes to<br />

the lakes and the high degree of urbanization have increased nutrient loading to the lakes and degraded water quality.<br />

The SWIM Plan for the Winter Haven Chain of Lakes focuses on implementing stormwater enhancement projects to<br />

improve water quality. The objectives of this project are consistent with this goal.<br />

Costs<br />

The total project budget is $125,000, with the City of Winter Haven and the District each contributing half $62,500.<br />

District funds shown in the table include staff salaries.<br />

Additional Information<br />

The proposed project is part of a larger effort funded by Winter Haven called the Sustainable Water Resources<br />

Management Plan (SWRMP). The objective of this plan is to preserve and protect the surface and ground water<br />

resources of Winter Haven for human and environmental use. The backbone of the plan is an interconnected,<br />

hydrologic network of lakes, canals, wetlands, aquifers, open spaces, and parks designed to meet the long-term water<br />

resource needs of the community. The Winter Haven Downtown Watershed Improvement Plan focuses on the<br />

development of a specific plan for LID/BMP improvements, the resulting potential project list within the downtown and<br />

neighborhood areas of the city, and the design, permitting and construction of those identified projects. The overall<br />

SWRMP will be closely coordinated with the District's Watershed Management Plan to meet the objectives of both<br />

plans. Other Items that might be included 1) Public Outreach Program to encourage homeowner use of rain gardens<br />

or other LID practices 2) Highlight the creation of natural systems in small isolated wetlands as a wildlife benefit 3)<br />

Potential for addressing local flooding issues 4) Mitigation banking opportunities within Winter Haven 5) Productive<br />

use of reclaimed water as applied to this project.<br />

020 - Peace River Basin 75

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!