H084<br />

Arcadia-DeSoto Interconnect<br />

Project Type WS&R Dev.<br />

AOR(s)<br />

Water Supply<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

City of Arcadia<br />

Project Manager FERGUSON, JOHN<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This interconnect will provide the City of Arcadia an alternative source of water while conserving 73 million gallons a<br />

year of treated potable water. The project consists of the construction of approximately 1200 feet of transmission main,<br />

backflow prevention device, meter, flow control valve, telemetry and other required valving and fittings necessary to<br />

interconnect the DeSoto County regional transmission and distribution water main to the City of Arcadia's raw water<br />

main. Currently, DeSoto County has to flush an average of approximately 200,000 gallons of treated water per day in<br />

order to meet water quality standards and maintain satisfactory chlorine residual within their existing regional<br />

transmission line from the PRMRWSA. The construction of the proposed interconnect will allow DeSoto County to<br />

send water to the City of Arcadia raw water main where it can be utilized to offset water withdrawn from the<br />

Intermediate Aquifer. It is anticipated that the imported water will reduce the City of Arcadia's groundwater withdrawals<br />

by approximately 33 gallons per household per day.<br />

Benefits<br />

The goal of this project would be to offset existing groundwater withdrawals by beneficially using water that is currently<br />

being discharged into a stormwater pond as a result of required flushing. The project would increase proper utilization<br />

of the water resources within the District's jurisdiction through more efficient use of the existing Desoto County water<br />

supplies. Upon completion, the project will provide an additional source of water for the City of Arcadia while reducing<br />

the amount of groundwater being withdrawn from the Intermediate Aquifer.<br />

Costs<br />

The total estimated cost of the project is $150,000 with the requested District share being $112,500 (75%, as<br />

applicable for REDI communities.) The District funding will be divided between the Governing Board, $56,250 (50%);<br />

and the Peace River Basin, $56,250 (50%). District funding is budgeted in FY20<strong>10</strong>.<br />

Project engineering costs are estimated to be $30,000 and construction is estimated at $120,000.<br />

Additional Information<br />

The City of Arcadia requested a reduction in the matching funds based on the Rural Economic Development Initiative<br />

(REDI) since the City meets the requirements for a economically distressed rural community as defined by S.<br />

288.0656. The estimated cost/benefit ratio for this project, calculated at an 8% APR over 5 years is $0.50 per<br />

thousand gallons based on a 5 year interconnect agreement between DeSoto and Arcadia and an anticipated savings<br />

of 200,000 gpd. Project advertising for bids are expected begin by November 1, 2009, construction start up anticipated<br />

on January 1, 20<strong>10</strong>, and substantial completion by March 1, 20<strong>10</strong>.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 0 0 0 56,858<br />

0 56,858<br />

020 Peace River Basin 0 0 0 57,098<br />

0 57,098<br />

Project Funds Not Budgeted by the<br />

District<br />

City of Arcadia 0 0 0 37,500<br />

0 37,500<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$151,456<br />

Critical Project Milestones Projected Amended Actual<br />

020 - Peace River Basin 227