N087<br />

(Withdrawn) Bradenton - Palmetto Reuse Interconnect<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Supply, Water Quality<br />

Basin(s) Manasota<br />

Cooperator(s)<br />

City of Bradenton<br />

Project Manager MCGOOKEY, SCOTT<br />

Task Manager(s)<br />

Status Withdrawn<br />

Description<br />

The project includes topographic survey, geotechnical investigation, design, development of construction documents,<br />

construction permitting, and construction of a new reuse pumping station at the City of Bradenton Water Reclamation<br />

Facility and extension of a new 16-inch transmission main north along 3rd Street West and across the Manatee River<br />

to the tie-in point with the PARS reclaimed water distribution system. The total length of new 16-inch transmission to<br />

be constructed is estimated to be 11,400 feet.<br />

Benefits<br />

This project will provide for beneficial reuse of approximately 2.5 mgd of reclaimed water and reduce the effluent<br />

discharge into the Manatee River. The customers will be identified in the FY2008 Interconnect Study (L854) that is<br />

scheduled to be complete August 30, 2008.<br />

Costs<br />

The total project cost is $3,650,000 and the District's share is requested to be $1,825,000. The City plans to spend<br />

$330,000 in FY2009 and the Manasota Basin Board has budgeted $165,000 which is fifty percent. The Manasota<br />

Basin will be requested to provide $625,000 in additional funds in FY20<strong>10</strong> and $1,035,000 in FY2011. The cost,<br />

amortized at 8 percent over 30 years is $0.59 per <strong>10</strong>00 gallons offset.<br />

Additional Information<br />

The Manasota Basin Board and the City of Bradenton have completed a feasibility study for expansion of the City's<br />

existing reclaimed water reuse system. After identification of numerous potential reclaimed water users, evaluation of<br />

15 alternatives, and coordination with both Manatee County and the City of Palmetto, a plan for expansion of the<br />

system by interconnecting with the Manatee County Area Reuse (MARS) system and the City of Palmetto Area Reuse<br />

(PARS) system has been selected. These two options are being further examined by the Bradenton / Palmetto /<br />

Manatee interconnect study (L854) during FY2008. The FY2009 funding requested is for completing the topographical<br />

survey, geotechnical investigation, design, development of construction documents, and permitting of the facilities for<br />

tie-in to the PARS system.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 0 0 168,661<br />

0 1,035,000 1,203,661<br />

Project Funds Not Budgeted by the<br />

District<br />

City of Bradenton 0 0 165,000 625,000 1,035,000 1,825,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$3,028,661<br />

Critical Project Milestones Projected Amended Actual<br />

Start Design 1/31/09<br />

Complete Design 9/15/09<br />

Start Construction 2/15/<strong>10</strong><br />

Complete Construction 6/30/11<br />

0<strong>21</strong> - Manasota Basin 340