N147<br />

Garden Grove Pines Stormwater Retrofit<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Flood Protection, Water Quality<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Polk County Natural Resources<br />

Project Manager THORNTON, SHELLEY<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This project is in response to a FY20<strong>10</strong> cooperative funding project request from Polk County to alleviate localized<br />

flooding and improve water quality in the Garden Grove Pines subdivision. The existing stormwater collection system<br />

is inadequate to convey the stormwater runoff from the 80 acre drainage basin. The project proposes retrofitting the<br />

existing storm sewer system and the construction of a 2.5 acre wet detention pond for treatment and attenuation. The<br />

stormwater system will be upgraded with a gravity pipe system which will route the stormwater system to a stormwater<br />

pond. The proposed stormwater pond will be constructed on a 3.0 acre parcel of land that formerly served as a<br />

wastewater treatment facility that the County is proposing to purchase. The pond will discharge through a control<br />

structure to an existing wetland system for polishing, then eventually to the Lake Florence outfall ditch.<br />

Benefits<br />

The Garden Grove Pines Stormwater Retrofit project will provide treatment of an 80 acre urban drainage basin that<br />

currently provides little water quality treatment and additional storage for the reduction of localized flooding.<br />

Costs<br />

The total project cost is $400,000, with Polk County and the District each contributing half ($200,000). District funds<br />

shown in the table include staff salaries.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin 0 0 0 201,893<br />

0 201,893<br />

Project Funds Not Budgeted by the<br />

District<br />

Polk County Natural Resources 0 0 200,000 200,000<br />

0 400,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$601,893<br />

Critical Project Milestones Projected Amended Actual<br />

1. Contract Development and Execution<br />

Draft agreement sent to Management Services 9/28/09<br />

Agreement returned from Management Services <strong>10</strong>/19/09<br />

Agreement sent to Cooperator <strong>10</strong>/19/09<br />

Signed agreement returned from Cooperator 12/1/09<br />

Agreement fully executed 12/31/09<br />

Notice to Proceed 12/31/09<br />

Status As Of: September 01, 2009<br />

A scope of work has been requested by the Cooperator. Once received, an agreement will be drafted.<br />

020 - Peace River Basin 344

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!