L672<br />

Polk - WMPlan Polk County<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Flood Protection, Water Quality, Natural Systems<br />

Basin(s) General Fund (District), Alafia River, Hillsborough River, Peace River<br />

Cooperator(s)<br />

Project Manager TURNER, DAWN<br />

Task Manager(s)<br />

Status Ongoing<br />

Polk County, Polk County Natural Resources<br />

Description<br />

This is a multi-year funded project to perform tasks related to the Topographic Information, Watershed Evaluation, and<br />

Watershed Management Plan elements of the District's Watershed Management Program (WMP) for watersheds in<br />

Polk County. Polk County encompasses approximately 2009 square miles within central Florida, of which 1,586 square<br />

miles are located within the District. Within the District, Polk County has 25 major watersheds. Of these, 11 have<br />

already been or currently are the subject of a Watershed Evaluation and/or Watershed Management Plan. This project<br />

will involve the development of Topographic Information, including 1-foot topographic contour maps using LiDAR data<br />

obtained by the District in 2005; the development of Watershed Evaluations and Watershed Management Plans for the<br />

remaining 14 watersheds; and updates of previous Watershed Evaluations and Watershed Management Plans to<br />

reflect changes in the watersheds, and to make the information consistent with the District's Guidelines and<br />

Specifications. Polk County watersheds will be prioritized, and work orders will be issued to consultants for individual<br />

watersheds.<br />

Benefits<br />

The WMP provides a method to evaluate the capacity of a watershed to protect, enhance, and restore water quality<br />

and natural systems, while achieving flood protection. The information developed provides the science for the District's<br />

Resource Management and Environmental Resource Permitting (ERP). It assists local governments: 1) with their land<br />

management responsibilities by establishing a level of service and developing Best Management Practices (BMPs) to<br />

address level of service deficiencies; and 2) provides a Geodatabase and projected results from watershed model<br />

simulations for floodplain management, and water quality management through the Total Maximum Daily Loads<br />

(TMDL) process for their National Pollution Discharge Elimination System (NPDES) permit requirements.<br />

Costs<br />

The total funding amount for this project is $2,856,954 of which the District's share will be $1,428,477. Polk County will<br />

contribute $1,428,477. For FY2007, $836,574 is appropriated in the following Basin budgets: Governing Board acting<br />

for the Green Swamp Basin ($289,978), Peace River Basin ($336,140), Alafia River Basin ($136,326), and the<br />

Hillsborough River Basin ($74,130). $418,287 in revenue will be received from Polk County, and distributed as follows:<br />

Governing Board ($144,989), Peace River Basin ($168,070), Alafia River Basin ($68,163), and the Hillsborough River<br />

Basin ($37,065). Basin funding and revenue distributions are based upon the percent project area within the Basin.<br />

With $836,574 in FY2007, the Topographic Information and Watershed Evaluations for the Polk City and Christina<br />

Watersheds will be completed. Watershed Evaluations will also be initiated for other priority watersheds, including the<br />

Reedy Creek and Bowlegs Creek watersheds. Watershed Evaluation updates will be initiated for the Itchepackesassa<br />

Creek and Poley Creek watersheds. $550,000 in FY2008 funding is appropriated in the following Basin budgets:<br />

Governing Board acting for the Green Swamp Basin ($96,500) Hillsborough Basin ($178,500) Polk County ($275,000).<br />

FY2008 funding will be used to complete Topographic Information, Watershed Evaluation and Watershed<br />

Management Plan tasks for Hillsborough River and Green Swamp watersheds. With FY2008 funds, the Polk City<br />

Watershed Management Plan will be initiated, and an update of the Itchepackesassa Creek Watershed Management<br />

Plan will be completed. FY2009 funding is appropriated in the following Basin budgets: ($74,250 Governing Board,<br />

$74,250 Alafia Basin, $74,250 Hillsborough Basin, and $222,750 Polk County). FY2009 funding is being used to<br />

complete Topographic Information, Watershed Evaluation and Watershed Management Plan tasks for Polk County<br />

watersheds. $524,880 in FY 20<strong>10</strong> is is appropriated in the following Basin budgets: $65,6<strong>10</strong> Governing Board,<br />

$65,6<strong>10</strong> Alafia Basin, $65,6<strong>10</strong> Hillsborough Basin, $65,6<strong>10</strong> Peace Basin, and $262,440 Polk County. FY20<strong>10</strong> funding<br />

is being used to complete Topographic Information, Watershed Evaluation and Watershed Management Plan tasks<br />

for Polk County watersheds. Future funding will be needed in future years to update or complete Watershed<br />

Evaluations and Watershed Management Plans for all of the Polk County watersheds. As tasks are completed, the<br />

project budget and scope will be refined based on the information developed. The District funding amounts shown in<br />

the table include staff salaries.<br />

Additional Information<br />

Polk County desires to create a county-wide Stormwater Master Plan to include data from previous Watershed<br />

Evaluations, Watershed Management Plans, Stormwater and Basin Master Plans, stormwater land development<br />

regulations, standards and criteria, recommended actions to satisfy new regulatory programs (NPDES and TMDL),<br />