N2<strong>21</strong><br />

Winter Haven Smart Controller Pilot Project<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Supply<br />

Basin(s) Peace River<br />

Cooperator(s)<br />

Winter Haven<br />

Project Manager BADER, TAMMY<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

The City of Winter Haven is proposing a pilot project using smart (ET) controller devices. The city will identify<br />

commercial customers with existing irrigation accounts that are not efficient water users though the utility billing<br />

records. Smart controllers are a relatively new and emerging technology, and may be appropriate for more complex<br />

irrigation systems with multiple clocks and zones (i.e., larger, commercial properties). They estimate or measure<br />

depletion of available plant soil moisture in order to operate an irrigation system, replenishing water as needed while<br />

minimizing excess water use. A properly programmed smart controller requires initial site specific set-up and will make<br />

irrigation schedule adjustments, including run times and required cycles, throughout the irrigation season without<br />

human intervention. The city will identify 50 customers with separate irrigation meters, evaluate irrigation system of<br />

each participant to ensure there are no leaks or broken sprinklers, purchase smart controllers and irrigation contractor<br />

to install smart controllers, and track monthly water consumption using utility billing records. Throughout the duration of<br />

the project, landscapes evaluations will be performed to monitor the health of the landscape.<br />

Benefits<br />

It is expected that the smart controllers will achieve an anticipated savings of 340,000 gallons per day.<br />

Costs<br />

The total cost of this project is estimated to be $45,000, of which the Peace River Basin is requested to fund 50<br />

percent, or $22,500. Funding in the amount of $22,500 has been budgeted in FY20<strong>10</strong>. The estimated cost/benefit ratio<br />

calculated at an 8% annual interest rate, over 5 years is $0.09/<strong>10</strong>00 gallons for the project.<br />

Additional Information<br />

The City of Winter Haven has an ordinance adopting SWFWMD emergency watering restrictions which provides for<br />

enforcement and fines by both the Police and Code Enforcement Departments. There is also a tiered utility rate<br />

structure in place that discourages high consumption of potable water. The city currently tracks and send postcards to<br />

all commercial accounts (with separate irrigation meters) that exceed 50,000 gallons of irrigation demand each month.<br />

Postcard reminders to each of these customers that they are High Irrigation Users, including their specific one day per<br />

week of permitted irrigation. The savings is based on the reduction of each 50 customer accounts from their current<br />

irrigation demand to 50,000 gallons each month. The city did discuss using the University of Florida to help track and<br />

compile data, however because this is a pilot program with only 50 customers, the city did not see the need to contract<br />

with the University.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

020 Peace River Basin 0 0 0 25,241<br />

0 25,241<br />

Project Funds Not Budgeted by the<br />

District<br />

City of Winter Haven 0 0 0 22,500<br />

0 22,500<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$47,741<br />

Critical Project Milestones Projected Amended Actual<br />

Contract Execution 12/31/09<br />