K120<br />

North Port - Water ASR - Phase V<br />

low oxygen levels. The recovery water quality data will provide information necessary to obtain an operational permit<br />

from the FDEP. The North Port the cooperative funding agreement, Phase V, for FY2009 is in effect. Groundwater<br />

sampling and testing from monitor wells are ongoing. An FDEP UIC permit modification has been applied for to reduce<br />

the frequency of sampling during the standby period. The water quality has returned to ambient conditions and the ASR<br />

well flow has been shut off. The consultant is working on the coordination and engineering of the degasification<br />

equipment.<br />

ACTION-TO-DATE: Delayed. The project has been delayed as noted in the status above. An information request<br />

concerning the Accelerate Florida Program was mailed to the cooperator on October 15, 2008. District follow-up email on<br />

January 12, 2009 prompted an email from Jennifer Desrosiers, North Port Business Manager, January 29, 2009. She<br />

sent a spreadsheet of preliminary action plans for projects with District funding. She states that she is eager to accelerate<br />

North Port projects. Specific to this ASR project she says "This project is being monitored pursuant to our SWFWMD<br />

contract and we are awaiting the results of the pre-treatment study being conducted at the Bradenton ASR project site to<br />

remove dissolved oxygen and other oxidants from the injection water to mitigate the arsenic problem."<br />

0<strong>21</strong> - Manasota Basin 246