H009<br />

Lake Hancock Outfall Structure P-11 Modification<br />

Status As Of: August 31, 2009<br />

Status History: See Project H008 for a detailed history on the project. Milestones and updates will be provided for this<br />

project once the P-11 design has been completed. As described in the project description steps 1 and 2 have been<br />

completed. Current Status: The engineering consulting firm DMK & Associates has been contracted to design the new<br />

Lake Hancock Outfall Structure (P-11). Project Milestones will be followed as part of project H008. The design process<br />

detailed in H008 has been accelerated so that construction of the new P-11 structure (H009) can start as soon as<br />