10.12.2012 Views

MANASOTA & PEACE RIVER BBDs Meeting Notebook 10-21-09.docx

MANASOTA & PEACE RIVER BBDs Meeting Notebook 10-21-09.docx

MANASOTA & PEACE RIVER BBDs Meeting Notebook 10-21-09.docx

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

B063<br />

USGS Manasota Basin Surface Water Flow, Level, and Water<br />

Quality Data Collection<br />

Project Type Basin Initiatives<br />

AOR(s)<br />

Water Supply, Flood Protection, Water Quality, Natural Systems<br />

Basin(s) Alafia River, Hillsborough River, Northwest Hillsborough, Coastal Rivers, Pinellas-Anclote River,<br />

Withlacoochee River, Peace River, Manasota<br />

Cooperator(s)<br />

United States Geological Survey<br />

Project Manager KINSMAN, GRANVILLE<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This initiative is to establish and maintain the Manasota Basin's surface water monitoring network, and is jointly funded<br />

by the Manasota Basin Board and the United States Geological Survey (USGS).<br />

Benefits<br />

This project provides basic surface water stage, discharge and/or water quality data collection to support assessing<br />

flooding events, developing surface water management plans, facilitating habitat restoration projects, establishment<br />

and monitoring of minimum flows and levels (MFLs), establishment of total maximum daily loads (TMDLs), land<br />

acquisition and management, and other critical water management activities.<br />

Costs<br />

In FY2009, surface water stage, discharge, and/or water quality is measured at 16 sites in the Manasota Basin for a<br />

cost of $231,900. These sites are: Myakka River at Myakka City, Howard Creek near Sarasota, Myakka River near<br />

Sarasota, South Fork Little Manatee River near Parrish, Gamble Creek near Parrish, Big Slough Canal near Myakka<br />

City, and South Fork Little Manatee River near Duette. In FY2009, two flow monitoring sites (Myakka at Control near<br />

Laurel and Cow Pen Slough near Bee Ridge) that were budgeted in FY2008 under Project H057 were added to this<br />

project for long-term monitoring. The cost increase in FY2009 reflects addition of these two new monitoring sites and<br />

an annual adjustment of pricing by the USGS. In FY20<strong>10</strong>, funding for this program will be transferred from the<br />

Manasota Basin Board to the Governing Board, and will be funded under the project code Z661.<br />

0<strong>21</strong> - Manasota Basin 119

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!