H079<br />

PRMRWSA Regional Resource Development - Phase I<br />

Project Type WS&R Dev.<br />

AOR(s)<br />

Water Supply<br />

Basin(s) General Fund (District), Peace River, Manasota<br />

Cooperator(s)<br />

Project Manager MORRIS, LISANN<br />

Task Manager(s)<br />

Status Ongoing<br />

Peace River/Manasota Regional Water Supply Auth.<br />

FERGUSON, JOHN<br />

Description<br />

The Regional Resource Development program will, in several phases, develop up to 35 mgd in average daily capacity<br />

of alternative/conjunctive drinking water supplies based on results of the Authority's Source Water Feasibility Study<br />

(H063). The new capacity is needed to meet regional reliability targets and growing regional needs. The new supplies<br />

are proposed for development at Shell/Prairie Creek, Cow-Pen Slough/Dona Bay, Upper Myakka/Flatford, and the RV<br />

Griffin Reserve. In May/June 2009 the Authority Board is scheduled to consider which alternative/conjunctive supply<br />

projects to move into preliminary design, so no specific project is available to review at this time.<br />

Benefits<br />

The Regional Resource Development program will focus on the objectives listed below: 1) Maximize surface water for<br />

public supply which in turn limits development pressure on groundwater in the SWUCA; 2) Provide rotational and<br />

reserve capacity enabling improved resource management opportunities such as source resting; 3) Participate in<br />

conjunctive projects that improve resource conditions while yielding economical water supply; 4) Optimize the regional<br />

financial investment in water supply and transmission capacity.<br />

Costs<br />

Because the process to chose the next project is taking longer than originally anticipated no additional funds will be<br />

allocated to this project for FY20<strong>10</strong>. Because the specific resource configuration has not been chosen yet, the District<br />

has set aside $600,000 from the West-Central Florida Water Resource Action Plan funding for FY2009. Total project<br />

cost of developing all three sources has a conceptual estimate of $514,000,000 with the District share including the<br />

WRAP funding at $257,000,000.<br />

Additional Information<br />

The Peace River/Manasota Regional Water Supply Authority (Authority) is comprised of Charlotte, DeSoto, Manatee<br />

and Sarasota Counties. In accordance with its Master Water Supply Contract, the Authority is obligated to timely<br />

develop and deliver new water supply sources and facilities to meet the needs of its customers. The Authority's<br />

Integrated Master Water Supply Master Plan (December 2006 draft) identified a need of up to 51.4 mgd of additional<br />

supply development to reliably meet member demands by 2025, and also evaluated six potential supply sources to<br />

meet future needs. The Source Water Feasibility study, initiated in July 2007 focus' on the three sources identified<br />

above as the highest potential future sources for the region. Though demand projections from members and<br />

customers has decreased development of new sources will be conducted in phases during the next 20 years to meet<br />

growing demands and critical system reliability requirements.<br />

020 - Peace River Basin 223