N156<br />

Polk County SWRUSA Carter Road Reclaimed Water Main<br />

Project Type Cooperative Funding<br />

AOR(s)<br />

Water Supply, Water Quality<br />

Basin(s) Alafia River, Peace River<br />

Cooperator(s)<br />

Polk County Utilities<br />

Project Manager BADER, TAMMY<br />

Task Manager(s)<br />

Status Ongoing<br />

Description<br />

This alternative water supply project consists of the design, permitting and construction of 8,150 feet of 16-inch<br />

reclaimed water transmission main along Carter Road from an existing pipeline on Carter Road, north to connect to<br />

the county's reclaimed water transmission main on County Road 540A.<br />

Benefits<br />

There are 561 dry-lined customers that will receive 224,400 gpd of reclaimed water to offset 134,640 gpd of potable<br />

water. In conjunction with a booster station that the county is planning to install in 2009, this new pipeline will also<br />

improve pressures and reliability within the eastern portion of the Southwest Regional Utility Service Area (SWRUSA)<br />

reclaimed water system.<br />

Costs<br />

The total project cost is $900,000. The District's share is requested to be $450,000. The Alafia River Basin Board has<br />

budgeted $240,000 in FY20<strong>10</strong>. It is expected that the county will request the remaining $2<strong>10</strong>,000 in FY2011. The cost,<br />

amortized at 8 percent over 30 years, is $1.61 per thousand gallons offset. The future funds identified for the project<br />

are contingent upon approval of such amounts by the District Governing and Basin Boards in the annual budget(s).<br />

Additional Information<br />

Of the total project cost of $900,000, approximately 91 percent ($820,000) is expected to be needed for construction,<br />

and the remainder ($80,000) for design and administration.<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

011 Alafia River Basin 0 0 0 243,787 2<strong>10</strong>,000 453,787<br />

020 Peace River Basin 0 0 0 2,641<br />

0 2,641<br />

Project Funds Not Budgeted by the<br />

District<br />

Polk County Utilities 0 0 0 240,000 2<strong>10</strong>,000 450,000<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$906,428<br />

Critical Project Milestones Projected Amended Actual<br />

Contract Execution 12/1/09<br />

Commence Design 1/1/<strong>10</strong><br />

Complete Design 6/30/<strong>10</strong><br />

Commence Construction 9/30/<strong>10</strong><br />

Complete Construction 9/30/11<br />

Contract Closeout 12/31/12<br />

Offset Report 12/31/13<br />

Status As Of: August 31, 2009<br />

A scope of work has been received from the cooperator. A cooperative funding agreement has been prepared and is<br />

expected to be executed late in 2009 or early in 20<strong>10</strong>. To date, $240,000 has been budgeted, of which $0 has been reimbursed.<br />

020 - Peace River Basin 347