Manatee - WMPlan BRADEN <strong>RIVER</strong><br />

current watershed conditions, and a subbasin and watershed connectivity inventory in GIS database format. SAI has<br />

completed all the deliverables for Work Order #2, which includes recent color orthophotographs, digital topographic<br />

information, GIS geodatabase of field reconnaissance/secondary survey data to date (40% effort), and supporting<br />

documentation for the selection of storm events for model calibration and verification. Work Order #3 with SAI, to<br />

complete the Watershed Evaluation element and begin development of the Watershed Management Plan, has been<br />

executed. Notice to Proceed on Work Order #3 was effective as of December 15, 2004. Work Order #4 for the Phase 1<br />

survey effort was executed on March 28, 2006. All task and deliverables under Work Order #4 are completed. SAI has<br />

completed the draft final Watershed Evaluation report under Work Order #3 and additional staff comments are being<br />

addressed. Work Order #5 for the surface water resource assessment has been executed and is currently in progress.<br />

The consultant team has prepared a spreadsheet water budget to quantify the amount of water entering the Bill Evers<br />

Reservoir (Ward Lake) and will serve as an input to the water quality model that is currently being calibrated. This model<br />

and associated write-up have been transmitted to the District and local cooperators for review and comments. The draft<br />

report on the water quality modeling effort is still being completed by the sub-consultant. The consultant is currently<br />

developing a refined schedule and budget to complete remaining tasks. Both schedule and budget are contingent upon<br />

collecting field measurements for remaining cross sections and hydraulic features. Two additional work orders will be<br />

developed to complete the project--first for the remaining survey/field measurements and the second to complete the<br />

Watershed Management Plan. SAI has selected a survey firm and is currently developing the detail scope of work,<br />

including how the information will be delivered. Both the consultant services agreement and the cooperative agreement<br />

for this project will need to be amended because it does not appear that the project will be completed by the end of<br />

December 2007. The surface water resource assessment final reports (quantity & quality) are being reviewed by District<br />

staff and cooperators. Work Order #6 is currently being developed to complete the remaining survey/field measurements<br />

(Phase 2). The cooperative agreement and consultant services agreement have been finalized for execution, to extend<br />

from December 31, 2007 to December 31, 2008. The surface water resource assessment (SWRA) final reports (quantity<br />

& quality) review comments from District staff and cooperators are being addressed by the consultants. Work Order #6 is<br />

currently being executed by the department's director and work will begin soon by the consultant to complete the<br />

remaining survey/field measurements (Phase 2). The cooperative agreement is being routed to the cooperators for<br />

execution to extend from December 31, 2007 to January 31, 2009. The consultant services agreement has been<br />

executed by the District on January 28, 2008. The consultant has developed a refined schedule and budget to complete<br />

remaining tasks. Two additional work orders will be developed to complete the project--first for the public notification,<br />

limited public meetings with large property owners or consultant firms, and watershed parameterization and the second<br />

to finish out the Watershed Management Plan. An additional funding of $220,000 has been requested for FY2009 to<br />

complete the project. This cost is associated with the increased survey costs, significantly more structures in watershed<br />

than anticipated and costs to cover public involvement not in original scope. District staff is currently developing a letter<br />

asking the cooperators for their participation in contributing to the requested additional funding. The consultants are near<br />

completion with the SWRA final reports, addressing comments from the District and the cooperators. Work Order #6 -<br />

Phase 2 of the survey/field measurements has been executed and the consultant has been given notice to proceed, May<br />

28, 2008. The cooperative agreement to extend the expiration date from December 31, 2007 to January 31, 2209 is<br />

currently with Manatee County. The requested additional funding for FY2009 to complete the project has been refined<br />

from $220,000 to $200,000. This additional amount will be shared among Manatee County, Sarasota County and the<br />

District. City of Bradenton is unable to contribute and their portion of contribution will be splitted among the remaining 3<br />

sources. The cooperative agreement to extend the expiration date to January 31, 2009 has been executed on July 9,<br />

2008. The SWRA water quality report has been finalized. The water quantity portion is being updated by the consultant.<br />

The consultant is near completion with WO#6, Phase 2 of the survey. Work Order #7, deliverable 1 was submitted to the<br />

District on July 14, 2008. The District provided comments to the consultant on December 9, 2008. The consultant is<br />

currently evaluating the inclusion of the hydraulic features for some of the 192 small ponds, where construction drawings<br />

do exist. The consultant will provide to the District a GIS layer summarizing the findings. A new cooperative agreement,<br />

extending the termination date to September 30, 20<strong>10</strong>, has been sent to the cooperators for signatures. Likewise, a new<br />

consultant agreement, extending the termination date to June 30, 20<strong>10</strong>, has been sent to SAI for signature. The SWRA<br />

final reports - Quantity & Quality have been sent to the cooperators. The final deliverable for survey phase 2, WO#6 has<br />

been submitted to the District on May 14, 2009. Current Status: The new cooperative agreement is still being routed for<br />

signatures. It's currently with Sarasota County. The new consultant agreement with SAI has been executed on 6/15/09.<br />

The last deliverable for WO#7 has been submitted to the District and the District has completed the review. SAI is<br />

addressing the District's comments at the moment and a GoTo meeting will be set up to discuss the results. SAI and the<br />

District will begin coordination for WO#8 to finish the remaining tasks of the project.<br />