H008<br />

Lake Hancock Lake Level Modification<br />

15. P-11 Construction Completion 12/31/11<br />

3. Step (3) River Lake Stormwater Pond<br />

1. Complete Design 11/30/08 3/30/09<br />

2. Submit Environmental Resource Permit 1/1/09<br />

3. Begin Construction 2/15/09<br />

4. Complete Stormwater Pond Construction 4/15/09<br />

3. Step(3) FDOT Design and Conceptual Permitting<br />

1. Submittal of FDOT Permits 11/19/07 8/15/09<br />

Status As Of: August 31, 2009<br />

Status History: The Preliminary Evaluation Report (Step 1) for Lake Hancock by BCI, Inc., is complete and was<br />

approved by the Governing Board in October 2004 for initiating preliminary design and conceptual permitting to raise the<br />

lake operating level from 98.7 to <strong>10</strong>0.0 feet (Step 2). With the approval of the Governing Board (October 26, 2004),<br />

District staff amended the contract and entered into a Work Order with BCI Engineers and Scientists, Inc. to begin Step<br />

(2) of the project on November 3, 2004. The Governing Board at their January 24, 2006 meeting authorized staff to<br />

submit a conceptual ERP application to the FDEP and the United States Army Corps of Engineers to raise the control<br />

elevation up to <strong>10</strong>0 feet NGVD to help meet the low flow requirements of the upper Peace River, upon reaching<br />

agreement through a Memorandum of Agreement (MOA) with Polk County. The Board authorized staff to develop a<br />

MOA with Polk County for the Lake Level Modification Project. With the approval of the MOA by the District at the July<br />

2006 meeting, a Conceptual ERP application was submitted to FDEP on August 31, 2006 for permitting. A Conceptual<br />

ERP was received from FDEP on June 14, 2007. The USACE Public Notice of Intent to permit was completed in<br />

December 2007 and approval was later received in April 2008. District staff have met with affected property owners in<br />

August and September, 2007 to discuss (1) project effects, (2) whether their property would be needed to implement the<br />

project, and (3) Board meetings and schedules. Current Status: Land Resources is currently negotiating with private land<br />

owners and purchasing their properties when successful negotiations are achieved. District staff is currently working on<br />

FDOT permits for Highway 540 and the Polk Parkway, and has contracted with BCI, Engineers and Scientists, Inc. to<br />

implement (Step 3), the design, permitting, and development of construction documents for mitigation required upstream<br />

of the P-11 Structure. The District has contracted the engineering consulting firm DMK & Associates to design the new<br />

Lake Hancock Outfall Structure (P-11). DMK has completed the P-11 60% design plans and specifications and will be<br />

subitting an application to FDEP for an ERP to construct the new P-11 structure. ACTION-TO-DATE: On-time, this<br />

project already has an accelerated schedule and District staff will continue to make sure the project tasks are being<br />

completed on schedule.<br />

020 - Peace River Basin 181