10.12.2012 Views

MANASOTA & PEACE RIVER BBDs Meeting Notebook 10-21-09.docx

MANASOTA & PEACE RIVER BBDs Meeting Notebook 10-21-09.docx

MANASOTA & PEACE RIVER BBDs Meeting Notebook 10-21-09.docx

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

W552<br />

Sarasota County Pollutant Model Development<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>21</strong> Manasota Basin 439,572 3,223<br />

0<br />

0 442,795<br />

District Budgeted - Outside Revenue<br />

Ecosystem Trust Fund - Sarasota Pollut<br />

(SWIM)<br />

Prior<br />

FY 2009 FY20<strong>10</strong><br />

Funding Funding Funding<br />

200,000 0<br />

0<br />

0<br />

200,000<br />

State Trust Funds (SWIM) 239,570 3,223<br />

0<br />

0 242,793<br />

Project Funds Not Budgeted by the<br />

District<br />

Sarasota County 431,907 0<br />

0<br />

0 431,907<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$1,317,495<br />

Critical Project Milestones Projected Amended Actual<br />

1. Contract Development & Execution<br />

Contract Executed 5/15/06 5/31/06<br />

Notice to Proceed Sent 5/31/06 5/31/06<br />

First Ammendment Approved - Time Extension 6/15/07 6/6/07<br />

2. Critical Project Milestones<br />

Draft Verification Monitoring Plan 12/<strong>10</strong>/06 2/<strong>10</strong>/07 1/30/07<br />

Draft Model Design Memorandum 1/<strong>10</strong>/07 7/15/07 7/15/07<br />

Final Verification Monitoring Plan 3/30/07 7/30/07 7/30/07<br />

Final Model Design Memorandum 4/30/07 9/30/08 <strong>10</strong>/30/08<br />

Draft Model Operation Manual <strong>10</strong>/30/07 1/30/09 1/30/09<br />

Final Functional Model 11/30/07 6/15/09 6/15/09<br />

Final Model Operation Manual/Final Report 12/15/07 5/25/09 6/15/09<br />

2. Critical Project Milestones<br />

No-Cost Time Extension Approved 1/<strong>10</strong>/09 3/30/09 1/30/09<br />

Contract Termination 6/30/09 6/30/09<br />

Status As Of: June 25, 2009<br />

Final model calibration including review of hydrology and water quality modules is complete. The SIMPLE model<br />

installation files have been made available for trial runs. Final calibration of the water quality module was anticipated to<br />

be completed in late November or early December 2008; however, data reviews noted inconsistencies in the values<br />

reported. Further inspection revealed stormwater samples collected were not flow weighted, therefore they are not<br />

suitable for use to develop EMCs (Event Mean Concentrations) for pollutants of interest. Established literature values for<br />

EMCs were used for model simulations and calibration. Project team members met in early December for model<br />

discussions and reviews. Additional time for final model calibration and testing was needed. Likewise, additional time was<br />

needed to subsequently draft the final project report. Sarasota County requested a no-cost time extension to the<br />

agreement. District staff concurred with the request. Approval of the extension was completed by early January 2009.<br />

The approved amendment extends the contract termination date to June 30, 2009. Additional time may be needed to<br />

sort out the EMCs issues and to process final invoices.<br />