H017<br />

Facilitating Agricultural Resource Management Systems Program<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 3,313,387 (1,800,492) 1,036,850 890,628<br />

0 3,440,373<br />

011 Alafia River Basin 225,416 (57,834) <strong>10</strong>4,585 82,096<br />

0 354,263<br />

013 Hillsborough River Basin 59,311 (45,000) 82,812 77,992<br />

0 175,115<br />

019 Withlacoochee River Basin 82,147 (<strong>10</strong>,000) 36,153 47,534<br />

0 155,834<br />

020 Peace River Basin 1,771,986 (944,030) 382,313 485,303<br />

0 1,695,572<br />

0<strong>21</strong> Manasota Basin 1,130,962 90,227 168,237 65,167<br />

0 1,454,593<br />

District Budgeted - Outside Revenue<br />

DACS - FARMS (H017) 1,417,416 33,495 0<br />

0<br />

0 1,450,911<br />

Ecosystem Trust Fund - FARMS 5,000,000 (3,244,618) 0<br />

0<br />

0 1,755,382<br />

State Approp - WRAP - Prior Year<br />

Funds<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

0 (607,193) 1,400,000<br />

0<br />

0<br />

792,807<br />

Project Funds Not Budgeted by the<br />

District<br />

Applicant Contribution 3,086,014 0 0<br />

0<br />

0 3,086,014<br />

Status As Of: September 03, 2009<br />

Total:<br />

Future<br />

Funding<br />

The FARMS Program has 78 active Board Approved projects in five of the District's nine Basins. The Program is<br />

intended to address issues within the District with the Southern Water Use Caution Area (SWUCA) and the Northern<br />

Tampa Bay Water Use Caution Area being targeted as areas of primary importance. Projected offset from the board<br />

approved projects is 13,541,828 gallons per day (gpd). Peace River Basin The Peace River Basin has 50 board<br />

approved active FARMS project with a projected offset of 8,699,793 gpd. Of the 50 projects in this Basin, 31 are<br />

operational with average groundwater offsets of approximately 3,168,464 gpd. Thirteen projects are under construction in<br />

this basin, and 6 more are in the contracting process. The Peace River Basin Board includes the Shell, Prairie, and<br />

Joshua Creek (SPJC) watershed, which is one of two priority areas designated for the FARMS Program. Thirty four of<br />

the 50 projects, including twenty three of the operational projects, are within the SPJC Priority area. Manasota Basin<br />

The Manasota Basin has fifteen board approved projects with a projected offset of 4,131,535 gpd. Of the fifteen projects<br />

in the Manasota Basin, eight are now operational, with groundwater offsets of approximately 2,844,424 gpd. Two projects<br />

are under construction, and five are in the contracting process. The Manasota Basin includes the other FARMS priority<br />

area, the Upper Myakka River Watershed. Ten of the fifteen projects are in the Upper Myakka River Watershed Priority<br />

area, including six of the operational projects. Hillsborough River Basin The Hilllsborough River Basin has two board<br />

approved FARMS Projects with projected offsets of 170,250 gpd. One project is now operational, Parke Family<br />

Hydrofarms, with an average groundwater offset of <strong>10</strong>,143 gpd. The other project is under construction. Green Swamp<br />

Basin FARMS has one operational project approximately 1 mile outside the SWUCA in the Green Swamp Basin. This<br />

project is offsetting approximately 36,931 gpd of groundwater. Alafia River Basin The Alafia Basin had six board<br />

approved projects with projected offsets of 488,850 gpd. Four projects are operational with groundwater offsets of<br />

approximately 441,846 gpd. Two projects are in the contracting phase. Withlacoochee River Basin. The Withlacoochee<br />

River Basin Board approved its first FARMS project at the February board meeting. This project is under construction,<br />

but it is projected to offset approximately 15,000 gpd of groundwater. FARMS is also providing partial funding for three<br />

regional projects. These projects are being coordinated through the Florida Department of Agriculture and Consumer<br />

Services. Two of them will help implement BMP programs for citrus growers and row crop farmers, and the other is the<br />

Mini-FARMS program that is described in greater detail under project number H529.<br />

020 - Peace River Basin 189<br />

Total<br />

Funding<br />

$14,360,864