F033<br />

Peace River Facility Expansion<br />

District Budgeted - Ad Valorem Based<br />

Revenue<br />

0<strong>10</strong> General Fund (Districtwide) 9,890,493 163 5,757,000 5,573<br />

0 15,653,229<br />

020 Peace River Basin 2,500,172 44 200,000 440,678 757,032 3,897,926<br />

0<strong>21</strong> Manasota Basin 6,613,473 1<strong>21</strong> 2,012,071 1,724,890<br />

0 <strong>10</strong>,350,555<br />

District Budgeted - Outside Revenue<br />

Water Protection & Sust T.F.<br />

(Alternative Wtr)<br />

Prior<br />

Funding<br />

Cumulative FY 2009 FY20<strong>10</strong><br />

Transfers Funding Funding<br />

15,918,289 0 0<br />

0<br />

0<br />

15,918,289<br />

Project Funds Not Budgeted by the<br />

District<br />

EPA Grant 9,000,000 0 0<br />

0<br />

0 9,000,000<br />

PR/MRWSA 35,499,860 0 1,656,227<br />

0<br />

0 37,156,087<br />

Total:<br />

Future<br />

Funding<br />

Total<br />

Funding<br />

$91,976,086<br />

Critical Project Milestones Projected Amended Actual<br />

Transmission Line Design Commence 9/1/02 <strong>10</strong>/1/03<br />

Consultant Selection 1/1/03 1/1/03<br />

Transmission Line Design Complete 3/1/03 5/1/03<br />

Draft Agreement to Contract Administration 4/1/03 6/9/03<br />

Draft Agreement returned from Contract Administration 5/1/03<br />

Transmission Line Construction Commence 6/1/03 7/30/04<br />

Peace River Basin Board Approval of Agreement 6/2/03 6/13/03<br />

Manasota Basin Board Approval of Agreement 6/2/03 6/18/03<br />

Governing Board Approval of Agreement 6/2/03 6/24/03<br />

Contract Executed 8/1/03 <strong>10</strong>/13/04<br />

Notice to Proceed 8/1/03 <strong>10</strong>/15/04<br />

Transmission Line Construction Complete 3/1/04 9/7/05<br />

Construction Complete <strong>10</strong>/31/06 1/1/06<br />

Bidding 11/15/06 2/8/07<br />

Award Construction Contract 11/30/06 3/19/07<br />

Plans and Specifications 9/30/07 11/30/06<br />

50% Completion 11/30/07 2/4/08<br />

<strong>10</strong>0% Completion 3/31/<strong>10</strong><br />

Contract Closeout <strong>10</strong>/1/16<br />

Status As Of: September <strong>10</strong>, 2009<br />

In February 2007, the Authority received one bid for Contract 2 for major components of the Facility Expansion. The bid<br />

was approximately $17 million over the original engineer's estimate of probable cost. After receiving the bid, Authority<br />

staff and the contractor negotiated a revised project cost $14 million below the original bid price. The Authority's Board<br />

approved the revised cost and authorized staff to enter into an agreement with the contractor. Even with the newly<br />

negotiated bid price, the overall revised project cost remained $19 million over the original project cost in the contract<br />

between the District and the Authority. The Authority requested additional funding as a result of the increased costs and<br />

an additional $3,756,693 in 2008 Water Protection and Sustainability Trust Funds and $8,205,398 in 2009 District<br />

funding were allocated to this project. Construction of the Facility Expansion Project will occur through three separate<br />

contracts. The first contract, completed in May, focused on site preparation. The second contract is for construction of a<br />

maintenance building, dewatering facility, filters, storage tanks, thickeners, and chemical feed and disinfection stations.<br />

The third contract is for construction of an operations center. A portion of the expanded facilities has been online since<br />

November 2008.<br />

ACTION-TO-DATE: On-time/Ahead of Schedule<br />

020 - Peace River Basin 177