W527<br />

Peace River Water Quality Monitoring<br />

1. Critical Project Milestones<br />

First Sampling Event <strong>10</strong>/3/00 <strong>10</strong>/3/00<br />

1. Critical Project Milestones<br />

FY2008 Monthly Sampling Complete 9/30/08 9/30/08<br />

FY2009 Monthly Sampling Complete 9/30/09 9/30/09<br />

FY20<strong>10</strong> Monthly Sampling Complete 9/30/<strong>10</strong><br />

Status As Of: September 01, 2009<br />

Water quality sampling is ongoing. Samples have been collected from October 2000 through August 2009. Field data<br />

has been submitted to the laboratory for inclusion into their database through June 2009.<br />

020 - Peace River Basin 52